You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Innovative C3I Technologies CFOR and AOC Applications for Synthetic Battlefield Development Environment

    SBC: Frontier Technology Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  2. Ultra High Heat Flux Electronics Cooler

    SBC: MAKEL ENGINEERING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  3. Economical and Reliable Adaptive Disturbance Cancellation for Lightly Damped Systems

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    Efforts to apply active noise and vibration control commercially, while intensifying, continue to be hampered by the cost of the computers required to implement the active algorithms. Currently, the cost of wide-band control is prohibitive for lightly damped systems such as precision structures or highly reverberant acoustic spaces, even if the system has just one canceling actuator and one error ...

    SBIR Phase I 1997 Department of DefenseAir Force
  4. Infrared Fisheye Optics

    SBC: OPTICS 1, INC.            Topic: N/A

    In this Phase I SBIR we will design a series of ultra-wide angle fisheye lenses suitable for fuzing sensors and their related test equipment. The lenses will be customized to cover three spectral bands from 3 microns to 12 microns as well as the visible. There are many factors that will need to be taken into account including control of radial magnification or distortion over the wide 180 degree ...

    SBIR Phase I 1997 Department of DefenseAir Force
  5. Processing of Selectively-Discontinuous-Fiber (SDF) Composite Materials

    SBC: Advanced Composite Operations            Topic: N/A

    This proposal is directed at creating discontinuous unidirectional composite from continuous unidirectional prepreg. The process, Selectively-Discontinuous-Fiber (SDF), introduces micro-cuts in preimpregnated unidirectional materials at specified locations. This process will allow unidirectional composite prepreg to be used for the fabrication of complex-compound components that have be ...

    SBIR Phase I 1996 Department of DefenseAir Force
  6. Nonintrusive System for Extraction of Interlayer Printed Circuit Patterns

    SBC: Aracor            Topic: N/A

    The goal of this two-phase program is to develop a prototype system which addresses the problem of nondestructively extracting layout patterns for multilayer printed circuit boards. The system will use x-ray digital tomosynthesis for image acquisition, and advanced image processing, including morphological operators, to extract circuit features from the images. The objectives of Phase I are to 1 ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. Data Management for Imaging Spectrometers

    SBC: Aerodyne Research, Inc.            Topic: N/A

    Imaging spectrometers are a powerful new tool for performing hyperspectral measurements for remote sensing, environmental monitoring, and target detection and characterization applications. The major problem associated with hyperspectral measurements now, however, is not the technology for performing the measurements but rather the technology for analyzing and recording the high data rates genera ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. Real-Time Inertial Measurement Unit Simulator

    SBC: AMERICAN GNC CORPORATION            Topic: N/A

    This SBIR Phase I project proposes the development of a real-time IMU simulator which can inject simulated electronic signals into the GPS guidance receiver with least intrusion and is applicable to a wide range of navigation systems. The proposed IMU Simulator consists of a PC compatible microcomputer, a set of plug -in IMU signal generator boards, and a set of general purpose flight simulator i ...

    SBIR Phase I 1997 Department of DefenseAir Force
  9. Low Cost Deposition of YBCO Films for Advanced HTS Conductor Applications

    SBC: AMERICAN SUPERCONDUCTOR CORPORATION            Topic: N/A

    This program develops and demonstrates an innovative, low cost, solution and non-vacuum based process for deposition of YBCO on continuous, textured metal tape substrates. It is easily scaleable for long lengths of continuous conductors, and is an inherently more cost effective as it is scaled.Recent advances in the deposition of thick YBCO films have demonstrated that fabricating practical, long ...

    SBIR Phase I 1997 Department of DefenseAir Force
  10. Diamond based, field emission cathode for small electrostatic thrusters

    SBC: Busek Co., Inc.            Topic: N/A

    Low power electrostatic thrusters are greatly penalized by the lack of small efficient cathodes. Conventional hollow cathodes are relatively large and consume power and propellant at a rate approaching that required by the small thruster, thus greatly reducing the overall efficiency and Isp. An attractive alternative to the hollow cathodes (which are thermionic emitters) are field emission array ...

    SBIR Phase I 1997 Department of DefenseAir Force
US Flag An Official Website of the United States Government