You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR

    SBC: Netrologic, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  2. A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS

    SBC: METROLASER, INCORPORATED            Topic: N/A

    THE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  3. Development of High Performance Water Tolerant Monolythic Scrubber for Closed Circuit Diving Systems

    SBC: Steam Machines, Inc.            Topic: N/A

    Development of a monolythic carbon dioxide scrubber material for us e in closed circuit underwater breathing apparatus. The project will specifically test water tolerance and absorbtion performance in closed breathing loop environments.

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. Low Power and Real-Time Oxygen Optrode

    SBC: Nanomaterials Research LLC            Topic: N/A

    Molecular oxygen is the most critical participant in respiratory pr ocess. Adequate oxygen supply is essential for the survivals of all living species. Fast, reliable and real-time measurement of oxygen concentration (partial pressure) is of great importance in assessing the health status of a person/soldier and the timely caring of critically ill patients. Presently available oxygen sensors suf ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  7. Man Personal Dual-Band Miniature Beacon

    SBC: SIERRA MONOLITHICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  8. Outboard Waterjet Propulsion Development

    SBC: VEHICLE DEVELOPMENT, INC.            Topic: N/A

    This effort will produce an advanced outboard engine system that ha s significant advantqages for SOF missions. It combines a high power, light weight, multi-fuel two-cycle engine, a chain transfer drive and a novel waterjet propulsion unit. The engine originally was used in small race casrs, then developed for commercial use in personal watercraft and ultra lig;ht aircraft. Light weight chain d ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
  9. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. Slowdown, goddammit

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N/A

    Early in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government