You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. POLY-COMPILER FOR PARALLEL PROCESSING

    SBC: Conceptual Systems & Software Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  2. HETEROGENEOUS PARALLEL PROCESSING CAPABILITY

    SBC: PARASOFT CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  3. AUTOMATIC PARALLELIZATION TOOL FOR SEQUENTIAL PROGRAMS

    SBC: PARASOFT CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  4. N-TYPE SEMICONDUCTING DIAMOND FOR DEVICE APPLICATIONS

    SBC: Schmidt Instruments Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  5. VERSATILE HIGH PERFORMANCE HOLOGRAPHIC OPTICAL COATINGS

    SBC: J.b.s. Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  6. Integrated Risk Management and Quality Assurance

    SBC: Accident Prevention Group            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  7. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. Self-Monitoring Surveillance System for Prestressing Tendons

    SBC: Construction Technology            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  9. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. PULSE TUBE CRYOGENIC REFRIGERATOR

    SBC: Peckham Engineering & Tool            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government