You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ASAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...
SBIR Phase II 1987 Nuclear Regulatory Commission -
ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AA RESEARCH PROJECT IS PROPOSED TO EVALUATE THE SUITABILITY OF NEWLY DEVELOPED SMART SENSOR TECHNOLOGIES FOR BOTH OF THEFOLLOWING NUCLEAR POWER PLANT APPLICATIONS: MANAGEMENT OF AGING DEGRADATION OF SAFETY SYSTEM TEMPERATUREAND PRESSURE SENSORS IN CONVENTIONAL LWRS SMART TEMPERATURE AND PRESSURE SENSORS FOR ADVANCED LWRS. THE PROJECT WILL ADDRESS BOTH THE CALIBRATION DRIFT AND RESPONSE TIME DEGRADA ...
SBIR Phase II 1992 Nuclear Regulatory Commission -
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS
SBC: Applied Biomathematics Inc Topic: N/ATHE FRANTIC COMPUTER CODE IS THE MOST ADVANCED MODEL FOR ADDRESSING TIME-DEPENDENT RISK EFFECTS ASSOCIATED WITH TECHNICAL SPECIFICATIONS. IT IS USED BY THE INDUSTRY FOR THE EVALUATION OF UPGRADES AND/OR IMPROVEMENTS IN EXISTING TECHNICAL SPECIFICATIONS AND BY THE NRC STAFF IN RESPONDING TO THE LICENSEE SUBMITTALS. THE EXISTING METHODOLOGY HAS TWO MAJOR DEFICIENCIES: IT DOES NOT PROVIDE THE BOUNDIN ...
SBIR Phase II 1988 Nuclear Regulatory Commission -
RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS
SBC: Applied Biomathematics Inc Topic: N/AN/A
SBIR Phase I 1987 Nuclear Regulatory Commission -
A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.
SBC: Eda Consultants Topic: N/ATHE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS
SBC: Mikayola International Topic: N/AAN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...
SBIR Phase I 1987 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission