You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SURGICAL INSTRUMENT DECONTAMINATION UNIT

    SBC: Abel Company            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  2. DEVELOPMENT OF DESIGN PARAMETERS AND CONCEPTUAL DRAWING FOR A PLASMA ETCHER TO CLEAN AND STERILIZE SURGICAL INSTRUMENTS

    SBC: Ammunition Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  3. SUPERHARD COATING FOR BEARINGS

    SBC: Artech Corp            Topic: N/A

    THE CUBIC CRYSTALLINE PHASE OF CARBON (DIAMOND) AND THE ANALOGOUS STRUCTURE OF BORON NITRIDE (CBN, BORAZON) ARE THE HARDEST KNOWN SOLIDS. TO MAKE USE OF THIS HARNESS FOR INCREASED WEAR RESISTANCE, COATINGS OF "DIAMONDLIKE" CARBON HAVE BEEN WIDELY STUDIED. ARTECH HAS DEVELOPED A TECHNIQUE FOR APPLYING SUPERHARD BORON NITRIDE COATINGS USING SIMULTANEOUS BEAMS OF BORON AND NITROGEN ATOMS, AND PROPOSE ...

    SBIR Phase I 1988 Department of DefenseArmy
  4. SUB MICROMETER MICROBIAL AEROSOL GENERATOR

    SBC: Babington Engineering            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  5. TESTING OF BUILT-IN-TEST (BIT) SOFTWARE

    SBC: C Max Co Inc            Topic: N/A

    THIS PROGRAM WILL DEVELOP TECHNIQUES, PROCEDURES, AND SPECIALIZED INSTRUMENTATION TO ACCESS THE BUILT-IN-TEST (BIT) SOFTWARE WITHIN A PRIME EQUIPMENT. CONTROL OF THE ACCESS INSTRUMENTATION AND BIT TESTING WILL BE ACCOMPLISHED WITH A PC XT TYPE COMPUTER. THE CONTROL SOFTWARE WILL BE DEVELOPED USING THE DEPARTMENT OF DEFENSE ADA LANGUAGE AND WILL BE TITLED ADA LANGUAGE SOFTWARE TEST PROGRAM (ALSTP). ...

    SBIR Phase I 1988 Department of DefenseArmy
  6. MAXIMIZING DATA ACQUISITION AND PROCESSING SYSTEM CAPABILITIES

    SBC: Calculex Inc            Topic: N/A

    A VARIETY OF HARDWRE ENHANCEMENTS HAVE BEEN MADE OVER THE YEARS TO THE HIGH ENERGY LASER DATA ACQUISITION AND PROCESSING SYSTEM (HELDAPS) AT THE WHITE SANDS MISSILE RANGE HIGH ENERGY LASER SYSTEM TEST FACILITY. THE EXISTING HELDAPS SOFTWARE DOES NOT FULLY UTILIZE THE CAPABILITIES OF THE ENHANCED SYSTEM CONFIGURATION. A PHASE I PROJECT IS PROPOSED TO SYSTEMATICALLY ANALYZE THE HELDAPS ROCESSING REQ ...

    SBIR Phase I 1988 Department of DefenseArmy
  7. DEVELOPMENT OF AIRBORNE NUCLEAR RADIATION DETECTOR

    SBC: CENTER FOR REMOTE SENSING, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseArmy
  8. WEATHER EFFECTS ON BACKGROUND SIGNATURES ALGORITHM DEVELOPMENT

    SBC: DCS CORP.            Topic: N/A

    THE INTERACTIONS BETWEEN TARGETS AND THE BACKGROUND IN BOTH THE VISUAL AND THERMAL SPECTRAL BANDS ARE AFFECTED BY SEVERAL WEATHER RELATED VARIABLES. THE DCS TE-EX MODEL WAS ORIGINALLY DEVELOPED AS A FIRST PRINCIPLES MATHEMATICAL MODEL TO PREDICT THE RADIATED TEMPERATURE OF TARGETS IN A FIELD ENVIRONMENT. THE MODEL, BECAUSE IT IS A FIRST PRINCIPLES MODEL, CAN BE USED TO PREDICT RADIATED TEMPERATURE ...

    SBIR Phase I 1988 Department of DefenseArmy
  9. TECHNIQUES FOR DEVELOPING EXECUTIVE DECISION AND THINKING SKILLS

    SBC: Decision Science Associates            Topic: N/A

    THE ARMY HAS LONG RECOGNIZED THAT A CRITICAL PART OF ITS LEADER DEVELOPMENT PROCESS IS INSTILLING IN EXECUTIVES THE REQUIRED DECISION-MAKING AND THINKING SKILLS. THE DIFFERENT MAJOR MILITARY EDUCATIONAL INSTITUTIONS HAVE INSTITUTED EXECUTIVE TRAINING PROGRAMS, EACH OF WHICH HAS DEVELOPED ITS OWN INNOVATIVE METHODS AND PEDAGOGICAL APPROACH. WHAT IS LACKING IS A THEORY TO TIE TOGETHER, EVALUATE, AND ...

    SBIR Phase I 1988 Department of DefenseArmy
  10. CONCEPTUAL MODELS OF UNIT PERFORMANCE

    SBC: Decision Science Associates            Topic: N/A

    OVERALL PERFORMANCE OF ARMY UNITS IS THE PRODUCT OF A COMPLEX INTERACTION OF A MYRIAD OF UNIT CHARACTERISTICS AND ENVIRONMENTAL FACTORS. WHILE ARMY SUBJECT-MATTER EXPERS (ESPECIALLY COMMANDERS) ARE ABLE TO MAJE JUDGMENTS ABOUT THE RELATIVE QUALITY OF UNITS, NO METRIC NOW EXISTS WHICH CAN BE APPLIED TO MEASURE UNIT PERFORMANCE. IT IS NECESSARY TO BUILD A MEASUREMENT MODEL WHICH ESSENTIALLY REPLICAT ...

    SBIR Phase I 1988 Department of DefenseArmy
US Flag An Official Website of the United States Government