You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
LASER INCISION FOR MECHANICAL REINFORCEMENT OF WOOD-BASED COMPOSITE MATERIAL
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1988 Department of Agriculture -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEVELOPMENT OF A DEEP BOREHOLE PERMEAMETER TO DETERMINE UNSATURATED HYDRAULIC PROPERTIES DEVELOPMENT OF A DEEP BOREHOLE PERMEAMETER TO DETERMINE UNSATURATED HYDRAULIC PROPERTIES
SBC: Daniel B. Stephens & Associates, Inc. Topic: N/APREDICTING THE RATE OF SOIL WATER MOVEMENT AND THE IMPACT OFAGRI-CHEMICALS ON WATER RESOURCES IS VITALLY IMPORTANT TO MANAGING AGRICULTURE, FOR OPTIMIZING PRODUCTIVITY AND MINIMIZING ENVIRONMENTAL IMPACT. SOPHISTICATED MODELS FOR MAKING SUCH PREDICTIONS ARE AVAILABLE, BUT DATA ON SOIL HYDRAULIC PROPERTIES ARE DIFFICULT AND OFTEN EXPENSIVE TO OBTAIN. IN FACT, AT DEPTHS BELOW THE ROOT ZONE THERE IS ...
SBIR Phase I 1990 Department of Agriculture -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
COUNTY AGENT ADVISOR SYSTEM (CAAS)
SBC: Xmco, Inc. Topic: N/AXMCO HAS IDENTIFIED AN OPPORTUNITY TO CONDUCT RESEARCH TO DETERMINE THE FEASIBILITY OF DEVELOPING A COUNTY AGENT ADVISOR SYSTEM (CAAS). THIS INNOVATIVE CONCEPT WOULD INVESTIGATE THE APPLICATION OF ARTIFICIAL INTELLIGENCE TECHNOLOGY, SPECIFICALLY HYPERMEDIA TECHNOLOGY WITH EMBEDDEDEXPERT SYSTEMS, TO THE ENVIRONMENT AND REQUIREMENTS OF COUNTY AGENTS. THIS MEETS A USDA NEED FOR INNOVATIVE TECHNOLOGY ...
SBIR Phase I 1990 Department of Agriculture -
APPLE PACKING LINE VISION ROBOTIC SYSTEM FOR DEFECT REMOVAL
SBC: AGRI-TECH, Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Agriculture -
INTERNATIONAL TRADE ASSISTANCE FOR RURAL AREAS USING EXPERT SYSTEM TECHNOLOGY
SBC: Columbia Cascade Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Agriculture -
WATER RESOURCE DECISION SUPPORT SYSTEM
SBC: Computation Geosciences Topic: N/AN/A
SBIR Phase I 1994 Department of Agriculture -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission