You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A SYNTHETIC BEAM SONAR SYSTEM FOR MOBILE ROBOTS AND TELEOPERATORS

    SBC: Cybermation Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  2. FABRICATION OF HIGH TEMPERATURE SUPERCONDUCTOR FILAMENTS FROM METAL-CONTAING POLYMERIC PRECURSORS

    SBC: FIBERTEK, INC.            Topic: N/A

    THE USE OF METAL-CONTAINING POLYMERS AS PRECURSORS TO HIGH CRITICAL TEMPERATURE (T(C)) SUPERCONDUCTING FILAMENTS WILL BE EXPLORED THROUGH A PROPRIETARY LOW-TEMPERATURE SOLUTION SYNTHESIS. CAREFUL EVALUATION OF THE PERTINENT CHEMICAL LITERATURE WILL BE DONE TO OPTIMIZE THE STARTING MATERIAL COMBINATION AND TO HELP DETERMINE ADEQUATE EXPERIMENTAL CONDITIONS THAT WILL YIELD A HOMOGENEOUS, POLYMERIC P ...

    SBIR Phase I 1988 Department of Energy
  3. A HIGH POWER MICROWAVE AMPLIFIER BASED ON TRANSVERSE MODULATION

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  4. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. THE DESIGN AND DEVELOPMENT OF AN ELECTRON BEAM DEFLECTION DIAGNOSTIC TOOL

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  6. A PINHOLE ANALYZER FOR THE CHARACTERIZATION OF GYRATING ELECTRON BEAMS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  7. RELATIVISTIC KLYSTRON TWO-BEAM ACCELERATOR DEVELOPMENT APPLICATIONS

    SBC: North Star Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  8. A FIBER OPTIC PRESSURE SENSOR FOR USE IN WELLBORES

    SBC: Optech            Topic: N/A

    PRESSURE MEASUREMENTS DEEP IN GEOTHERMAL WELLBORES PROVIDE SOME OF THE MOST VALUABLE DATA FOR MEASURING THE PRODUCTIVITY OF GEOTHERMAL WELLS AND FOR ASSESSING RESERVOIRCHARACTERISTICS. WELLBORES HAVE VERY HIGH PRESSURE AND VERY LOW PH, BUT, MOST SIGNIFICANTLY, THEY HAVE VERY HIGH TEMPERATURES (UP TO 350 DEGREES CENTIGRADE) THAT PRECLUDE PRESENT PRESSURE MEASURING INSTRUMENTATION FROM OPERATING ADE ...

    SBIR Phase I 1988 Department of Energy
  9. APPLYING A NOVEL STEAM AND CARGON DIOXIDE COMBINATION PROCESS IN HEAVY OIL AND TAR SAND RESERVOIRS

    SBC: R. L. Clampitt And            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Energy
  10. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government