You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Development of a Performance Assessment Process Controller
SBC: Innovative Tech. Solutions Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
Advanced Digital Man-Machine Interface Analysis
SBC: Ryan Nuclear, Inc. Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1995 Nuclear Regulatory Commission -
USE OF CERAMIC FUEL CLADDING TO REDUCE THE SEVERITY OF LMR ACCIDENTS
SBC: Gamma Engineering Corporation Topic: N/ATHIS PROJECT INVESTIGATES THE FEASIBILITY OF USING CERAMIC CLADDING MATERIALS TO REPLACE THE METALLIC CLADDING MATERIALS NOW USED WITH WATER REACTOR FUEL. SHOULD FEASIBILITY BE DETERMINED, AND EVENTUALLY COMMERCIALIZED, THE ABILITY OF WATER REACTORS TO WITHSTAND SEVERE ACCIDENTS WOULD BE ENHANCED. WITH TODAYS METAL CLAD FUEL, A RELATIVELY SHORT TIME PERIOD IS AVAILABLE AFTER A LOSS OF COOLANT ACCI ...
SBIR Phase I 1989 Nuclear Regulatory Commission -
QUANTIFICATION OF CONSERVATISMS IN SEISMIC RISK ESTIMATES THROUGH ENGINEERING ADVANCEMENT OF SEISMIC PRA
SBC: Risk Engineering Inc. Topic: N/AN/A
SBIR Phase I 1989 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1989 Nuclear Regulatory Commission -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission