You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADA QUALITY TOOLSET

    SBC: Software Design & Analysis Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  2. A MICROMOTOR-BASED SPATIAL LIGHT MODULATION (SLM) SYSTEM

    SBC: STERLING RESEARCH CORPORATION            Topic: N/A

    WITH THE ADVENT OF ELECTROSTATIC MICRO-MOTORS, COME POSSIBILITIES FOR SMALL, FAST AND INEXPENSIVE SPATIAL LIGHT MODULATION (SLM) DEVICES, PARTICULARLY IN THE AREAS OF INVASIVE BODY IMAGING, CATHETER-DIRECTED LASER ABLATION SURGERY, IMAGE SCANNING AND VECTOR-CONTROLLED LIGHT-BEAM MODULATORS. PRESENT-DAY SLMS ARE TYPICALLY LIMITED IN THEIRRANGE OF MOTION OR ARE QUITE LARGE IN SIZE. MICRO ELECTRO-MEC ...

    SBIR Phase I 1990 National Science Foundation
  3. AN INNOVATIVE USE OF PULSED POWER TECHNOLOGY FOR SEPARATING MINERALS FROM ORES

    SBC: Tetra Corporation            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. LASER-DRIVEN DIRECTIONAL SOLIDIFICATION IN HIGH TC SUPERCONDUCTING FIBERS

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  6. NONINTRUSIVE PHOTOACOUSTIC CHARACTERIZATION OF CRITICAL PROPERTIES IN HIGH TC SUPERCONDUCTING MATERIALS

    SBC: American Research Corporation of Virginia            Topic: N/A

    THE RECENT DISCOVERY OF NEW HIGH TEMPERATURE SUPERCONDUCTOR SYSTEMS HAS CREATED A NEED TO DEVELOP COMPATIBLE MEASUREMENTTECHNIQUES TO CHARACTERIZE THE ELECTRICAL, STRUCTURAL, ACOUSTIC AND OPTICAL PROPERTIES OF THESE MATERIALS. ALTHOUGH MANY STANDARD METHODS OF MEASURING CONVENTIONAL SUPERCONDUCTING MATERIALS CAN BE ADAPTED TO NEW HIGH TC SUPERCONDUCTOR SYSTEMS, EFFECTIVE MEASUREMENT OF CRITICAL PR ...

    SBIR Phase I 1990 National Science Foundation
  7. "RELIEF OF ENERGY TRANSFER LIMITATIONS IN ELECTRICAL POWER SYSTEMS"

    SBC: Ecc Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Science Foundation
  8. SBIR Phase I: Accelerating-Focusing Rectangular Cavity Structures

    SBC: World Physics Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
  9. SBIR Phase I: Acoustic Beamforming for Process Monitoring

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1997 National Science Foundation
  10. SBIR PHASE I: A Detailed Model of Turbulent Mixing and Reaction for Non-Premixed Reacting Flow Computations

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: N/A

    N/A

    SBIR Phase I 1996 National Science Foundation
US Flag An Official Website of the United States Government