You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. OPTIMAL ENERGY MANAGEMENT FOR KINETIC ENERGY WEAPONS

    SBC: BARRON ASSOCIATES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  2. HYBRIDIZED METAL MATRIX COMPOSITES FOR PASSIVE DAMPING

    SBC: CORDEC CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  3. TRANSPIRATION COOLED ULTRAVIOLET SOL-GEL SILICA OPTICS

    SBC: GELTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  4. HIGH SPECIFIC POWER/ENERGY RECHARGEABLE BATTERY CONCEPT

    SBC: Innovations Solutions From Adv            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  5. CERAMIC FOAM SANDWICH AS A STRUCTURAL MATERIAL

    SBC: International Dynamics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. CROSSED-FIELD WIGGLER

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  8. Control and Direct Measurement of Power Density of Laser Beams

    SBC: BEAM ENGINEERING FOR ADVANCED MEASUREMENTS CO.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  9. Comprehensible Descriptions for Fast Processing of Image Data

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  10. Ultraspectral Imager

    SBC: KESTREL CORP            Topic: N/A

    This Phase I SBIR demonstrates the underlying technology required to construct an ultraspectral imager that has the ability to spectrally resolve molecular absorption lines while simultaneously creating a two dimensional spatial mapping. The proposed instrument will have a spectral resolution that is better than 2 cm-1 and two dimensional spatial resolution that exceeds 2 milliradian. Based on Fou ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government