You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Traffic Intersection Simulation of IntelliDrive, J2735, and DSRC/WAVE with eTEXAS
SBC: HARMONIA HOLDINGS GROUP, LLC Topic: 101FH3Harmonia’s proposed work will be instrumental in accelerating the maturity of IntelliDrive applications that avoid intersection collisions. This proposal unlocks the storehouse of modeling detail in TEXAS under the cost-free GPL copyleft license to organizations building IntelliDrive applications for collision avoidance at intersections. We add SAE J2375 sPAT messages reporting traffic signal ...
SBIR Phase I 2010 Department of Transportation -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device
SBC: EYEGAZE INC Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
High Resolution Data Sources and Applications for Transportation Planning
SBC: Shenandoah Mountain Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Software for In-Flight Detection of Widespread Fatigue in Engine Disks
SBC: Monitoring Technology Corp Topic: N/AThe proposed project will demonstrate unique digital signal processing software for automated, early detection of Widespread Fatigue (WF) damage in turbine engine disks. The software, known as RVMD is based on recently patented technology in Rotational Vibrationa Monitoring (RVM). RVMD will measure loss of disk structural rigidity due to WF defects, both from High Cycle and Low Cycle Fatigue. ...
SBIR Phase I 1996 Department of Transportation -
Feasibility Study of an Internet-Based GUI for Highway Capacity Software
SBC: Viggen Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
Neutron Radiography with Inorganic Scintillation Detectors
SBC: World Physics Technologies, Inc. Topic: N/AWe propose here to evaluate a variety of inorganic scintillators, including sodium iodide and bismuth germanate, for use in energy-sensitive neutron detectors. We will couple these crystals to photomultiplier tubes and measure the prompt response to inelastic neutron reactions with the scintillator atoms. To unfold the incident neutron energy distribution from the resulting signal pulse heights, ...
SBIR Phase I 1996 Department of Transportation -
"Rolling Deflectometer"
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation