You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1986 Nuclear Regulatory Commission
  4. BASED ON HEAT RELEASE MONITORING: A DEMONSTRATION PROGRAM

    SBC: Geoscience Ltd            Topic: N/A

    THE PROPOSED PROGRAM CONSISTS OF THE DEVELOPMENT OF A TECHNIQUE AND A SYSTEM TO MEASURE THE RADIOACTIVE DECAY OF OF RADWASTE CONTAINED IN STORAGE CANISTERS, CASKS AND VAULTS. THE SYSTEM BEING CONSIDERED DEALS WITH THE DIRECT MEASUREMENT OF THE AFTERHEAT BEING GENERATED IN THE RADWASTEVOLUMES. THE SYSTEM TO BE USED TO ACCOMPLISH SUCH MEASURE MENTS CONSISTS OF A HEAT FLUX SENSOR ENVELOPE THAT SURROU ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
  5. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA

    SBC: Modeling & Computing Services            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  9. ASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA.

    SBC: Pickard, Lowe & Garrick Inc.            Topic: N/A

    ASSESSMENT OF RARE EVENT FREQUENCIES OFTEN REQUIRES SIGNIFI-CANT RELIANCE ON EXPERT JUDGEMENT DUE TO THE SCARCITY OF EMPIRICAL DATA. IN THIS WORK, FORMAL MODELS FOR USING THE OPINIONS OF SINGLE AND MULTIPLE EXPERTS WILL BE EVALUATED INLIGNT OF EMPIRICAL DATA. THE OBJECTIVE IS TO SEE TO WHAT EXTENT THE EMPIRICAL DATA "VALIDATES" THE EXPERTS' ESTIMATES, AS WELL AS THE MODELS USED FOR ANALYZING SUCH ...

    SBIR Phase I 1986 Nuclear Regulatory Commission
  10. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government