You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  2. A HIGH EFFICIENCY TRIVALENT CHROMIUM BATH FOR HARD CHROME PLATING

    SBC: Electrochemical Innovations            Topic: N/A

    A HIGH EFFICIENCY PLATING BATH WITH CHROMIUM PRESENT IN THE TRIVALENT STATE ONLY HAS BEEN DEVELOPED IN THE LABORATORY INFOR HARD CHROME PLATING. THIS PROCESS WILL BE TESTED ON AN INDUSTRIAL SCALE TO DETERMINE ITS ACCEPTABILITY FOR PLATING AND ITS EFFECTIVENESS IN ELIMINATING HEXAVALENT CHROMIUM FROM SOLID CHROMIUM PLATING WASTES. IT IS ANTICIPATED THAT THIS RESEARCH WILL LEAD TO A VIABLE TRIVALENT ...

    SBIR Phase I 1988 Environmental Protection Agency
  3. A MEMBRANE-BASED PROCESS FOR THE REMOVAL OF BTEX FROM GLYCOL DEHYDRATION VENTS

    SBC: BEND RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Environmental Protection Agency
  4. A NEAR-INFRARED DIODE LASER-BASED CONTINUOUS EMISSIONS MONITOR FOR NITROGEN OXIDES

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    This project addresses the development of diode-laser-based continuous-emissionsmonitors (CEMs) to meet the emissions monitoring requirements imposed on a widerange of industries by Federal and state clean air regulations. The overridingobjective is the development of new, highly reliably instrumentation that hassubstantially lower long term operating and maintenance costs than existinginstrument ...

    SBIR Phase I 1995 Environmental Protection Agency
  5. APPLICATION OF PULSE COMBUSTION IN SOLID AND HAZARDOUS WASTE INCINERATION

    SBC: Sonotech Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Environmental Protection Agency
  6. Development of a Membrane-based System for the Recovery and Reuse of Solvents

    SBC: BEND RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  7. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  8. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government