You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Mobile and Social Approach to Fostering Casual Carpooling in New Corridors
SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION Topic: 161FH1The technical objective of this Phase I project is to develop concept that demonstrates the viability of one or more tools and/or approaches to catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. The proposed approach offers four unique components: (1) building off of the existing casual carpoolin ...
SBIR Phase I 2016 Department of Transportation -
Pedestrian and Cyclist Detection Devices for Transit Buses
SBC: NOVATEUR RESEARCH SOLUTIONS LLC Topic: 161FT1This SBIR proposal presents a robust and cost-effective pedestrian and cyclist detection and collision warning system for transit buses. It uses inexpensive but robust sensors and incorporates state-of-the-art object detection techniques to enable effective pedestrian and cyclist detection near transit buses in different environmental conditions. The proposed collision warning system exploits meas ...
SBIR Phase I 2016 Department of Transportation -
Improved Source Location Using Sensor-Arrays
SBC: Cyltek, Inc. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device
SBC: EYEGAZE INC Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
High Resolution Data Sources and Applications for Transportation Planning
SBC: Shenandoah Mountain Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Broken Rail Detection
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Pavement Ice Detection
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation