You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A2a--Adenosine Agonist for Cardiovascular Imaging
SBC: Discovery Therapeutics, Inc. Topic: N/AAdenosine produces coronary vasodilation through activation of A-2a adenosine receptors. However adalso acts at A1 adenosine receptors to slow atrioventricular conduction and when injected into man ican be blocked with A1 receptor antagonists. DTI has synthesized a number of adenosine analogs that2a subtype of adenosine receptor and have identified WRC-0470 as a potent selective short acting corou ...
SBIR Phase I 1995 Department of Health and Human Services -
A Balloon Assisted Launch System
SBC: Winzen Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseAir Force -
Abductive Electronics Prognostic Tool (ADEPT)
SBC: ABTECH CORPORATION Topic: N/AAbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...
SBIR Phase I 1997 Department of DefenseAir Force -
A Beamforming, Acoustic Target Tracking and Classification System
SBC: TPL, INC Topic: N/AOperation of heavy equipment results in the generation of high sound levels. These sounds (exhaust from diesel or turbine engines, clatter of vehicle parts and cargo, movement of joints, etc.), when taken together result in a characteristic acoustic signature. Depending on terrain and environmental conditions this sound may carry several kilometers. This unintentional noise offers an opportunit ...
SBIR Phase I 1995 Department of DefenseArmy -
A Beginning Sign Language VideoCourse for Hearing Adult Learners
SBC: The Masters Group Topic: N/AN/A
SBIR Phase I 1996 Department of Education -
A Bio-Electrical, Stress-Responsive Composite Coating for Prostheses
SBC: LYNNTECH INC. Topic: N/AN/A
SBIR Phase I 1995 National Science Foundation -
A BOREHOLE TUBEWAVE DAMPER PROBE FOR HIGH RESOLUTION SEISMICAPPLICATIONS
SBC: High Resolution Seismics Inc Topic: N/AHIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE OIL RESERVOIR HETEROGENEITIES. TO DATE, MUCH OF THE HIGH RESOLUTION CROSS-WELL RESEARCH HAS INVOLVED THE USE OF FLUID-COUPLED PIEZOELECTRIC SEISMIC SOURCES. HOWEVER, IN PRACTICAL COMMERCIAL APPLICATIONS OF FLUID-COUPLED SOURCES, SOME CONSIDERATION MUST BE GIVEN TO DEPLOYING THE SOU ...
SBIR Phase I 1991 Department of Energy -
A BOREHOLE WALL-LOCKED PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS
SBC: High Resolution Seismics Inc Topic: N/AHIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE MUCH OF THE INFORMATION NEEDED TO IDENTIFY SUBTLE RESERVOIR HETEROGENEITIES THUS ALLOWING STRATEGIES PLACEMENTOF PRODUCTION WELLS. HIGH RESOLUTION SEISMIC TECHNIQUES ARE IDEALLY SUITED TO HARD ROCK APPLICATIONS WHERE FORMATIONVELOCITIES EXCEED 10,000 FEET PER SECOND. HOWEVER, TO DATE,THE ACQUISITION OF HIGH FREQUENCY TOMOGRAPHIC D ...
SBIR Phase I 1991 Department of Energy -
ABR with Low Bandwidth ATM
SBC: SCIENTIFIC RESEARCH CORP. Topic: N/AThis proposal has three main efforts:1. Extension of the ATM Forum ABR protocol to allocate bandwidth according to quality of service (QoS) and priority level of the individual connection. This project will utilize the informational bits provided by the fields to support QoS and priority level acknowledgment.2. Design of an ATM application that utilizes the ABR service via an application programme ...
SBIR Phase I 1997 Department of DefenseAir Force -
ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES
SBC: MATERIALS MODIFICATIONS INC Topic: N/AIN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...
SBIR Phase I 1991 Department of DefenseArmy