You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Data Fusion for Timely Screening of Treaty Verification Data
SBC: ABTECH CORPORATION Topic: N/AN/A
SBIR Phase II 1996 Department of Energy -
A Three Dimensional Flow Parallel-Processing System for Fast Programmable Real-Time Applications
SBC: 3D-Computing, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Energy -
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/A40640 November 12, 1996 Adherent Technologies, Inc. Scintillators have been used for over 90 years to detect ionizing radiation, but solid organic scintillator, commonly used in physics experimentation, suffer from errors caused by pulse pileup. To minimize this problem, this project will examine a new class of polymeric materials which also offer the po ...
SBIR Phase II 1997 Department of Energy -
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A RECUPERATOR FOR CRYOCOOLERS
SBC: Almatech Topic: N/ATHIS PROJECT INVOLVES DEVELOPMENT AND VERIFICATION OF THE PERFORMANCE OF A NOVEL HEAT EXCHANGER OPERATING IN THE 98 TO 99 PERCENT THERMAL EFFECTIVENESS RANGE. HEAT EXCHANGERS FOR CRYOCOOLER APPLICATIONS USED IN HIGH ENERGY PHYSICS, REMOTE SENSING, ETC., FREQUENTLY REQUIRE THERMAL EFFECTIVENESS OF OVER 98%. THIS IS DIFFICULT TO ACCOMPLISH,PRIMARILY BECAUSE OF THE EFFECT OF THE LONGITUDINAL THERMAL ...
SBIR Phase I 1988 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/A40417 November 18, 1996 American Research Corporation of Virginia This project addresses the hazardous waste problem at Department of Energy sites by developing a new class of ultrafiltration membranes for use in corrosive aqueous or organic streams. These membranes will utilize mesoporous ceramics, which have narrow pore size distributions and tailorabl ...
SBIR Phase II 1997 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/A40063 November 4, 1996 Amparo Corporation First-generation radioactive beam facilities, in use or under construction, cannot completely address many of the scientific opportunities envisioned until an intense production beam is employed. This project addresses a key element in filling this need, the design of high power nuclear targets. The targe ...
SBIR Phase II 1997 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/AN/A
SBIR Phase I 1996 Department of Energy -
A NOVEL, INSULATED, DOUBLE-WALLED TUBE DESIGN FOR THERMALLY-ENHANCED OIL RECOVERY
SBC: Carbotek Inc Topic: N/AA NOVEL, DOUBLE-WALLED, VACUUM-INSULATED TUBE IS PLANNED FOREFFICIENT TRANSMISSION OF HOT WATER OR STEAM FOR ENHANCED THERMAL RECOVERY OF HEAVY OIL FROM DEEP OIL RESERVOIRS. THIS DESIGN IMPROVES THE STRUCTURAL RELIABILITY WHILE P PROVIDING IMPROVED THERMAL INSULATION HAVING A LOW MANUFACTURING COST. PHASE I OF THIS PROGRAM INVOLVES THE DETAILED ANALYSIS, DESIGN, AND OPTIMIZATION OF THE TUBING. A P ...
SBIR Phase II 1988 Department of Energy