You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Compact X-Ray Laser

    SBC: Tetra Corporation            Topic: N/A

    The advanced technology described in this proposal promises to increase the performance of laboratory and, specifically, tabletop x-ray lasers by up to an order of magnitude. Such gains in performance coupled with compact technology will lead to the introduction of the world s first table-top, commercial x-ray laser. Tetra proposes to develop an advanced driver for the laboratory laser based upo ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  2. Active Mode Millimeter Wave Imaging

    SBC: K&c Tech., Inc.            Topic: N/A

    This proposal addresses an approach to millimeter wave imaging called encoded image detection (EID). The concept offers a means of achieving a low cost, all weather seeker for smart munition and submunitions. Its low cost potential makes adaptation of the imager also attractive for a variety of other military applications such as search and rescue, surveillance, and security. Most current devel ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  3. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. ARRAY COMMUNICATIONS COPROCESSOR

    SBC: Systems & Processes Engineering Corporation            Topic: N/A

    AN ARRAY COMMUNICATIONS COPROCESSOR (ACC) ARCHITECTURE HAS BEEN DEVELOPED THAT PROVIDES AUTOMATIC, ADAPTIVE, AND DYNAMICALLY CONFIGURABLE INTER-PROCESSOR COMMUNICATIONS AND IS COMPATIBLE WITH MOST COMMERCIALLY AVAILABLE STATE-OF-THE-ART COMPLEX INSTRUCTION SET COMPUTERS (CISC) AND REDUCED INSTRUCTION SET COMPUTERS (RISC). IN THIS INVESTIGATION, THE ARRAY COMMUNICATIONS CONTROLLER IS BEING IMPLEMEN ...

    SBIR Phase II 1990 Department of DefenseMissile Defense Agency
  6. Carbide Electrodes for High Power Ultracapacitors

    SBC: T/J Technologies, Inc.            Topic: N/A

    In this project we will develop processes for fabricating new high surface area (HSA) ceramic electrode materials. These processes will be extensions of processes developed for producing carbon sieves. The new materials will be similar but superior to HSA molybdenum nitride electrodes developed recently by T/J Technologies, Inc. Carbide based electrodes produced by this new process will significan ...

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  7. CERAMIC INSULATORS FOR PULSED ELECTROTHERMAL DISCHARGES GTD-43

    SBC: Gt-devices Inc            Topic: N/A

    HIGH POWER ELECTROTHERMAL DISCHARGE TECHNOLOGY PROVIDES AN ATTRACTIVE APPROACH FOR ACCELERATING SDI KEW PROJECTILES AND FOR SDI SPACE PROPULSION. STORED ENERGY IS USED TO HEAT SUITABLE PLASMA MATERIALS IN A LARGE L/D TUBE ON MICROSECOND TIME SCALES, CREATING A HIGH PRESSURE,LOW MOLECULAR WEIGHT JET. REPETITIVE OPERATION OF THESE JETS REQUIRESDEVELOPMENT OF A HIGH STRESS INSULATOR, RESISTANT TO THE ...

    SBIR Phase II 1987 Department of DefenseMissile Defense Agency
  8. Comprehensible Descriptions for Fast Processing of Image Data

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseMissile Defense Agency
  9. CROSSED-FIELD WIGGLER

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  10. DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    SAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government