You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
The Origin And Significance Of Electrical Stratospheric Phenomena
SBC: Aerospace Engineering Group Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Use Of Unmanned Aerial Vehicles (Uavs) For Earth Remote Sensing
SBC: Bai Aerosystems Inc Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Extended Operating Temperature Range Of Self Humidified Proton Exchange Membrane Fuel Cells
SBC: Bcs Technology Inc Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Solar Waveguide-Heated Fluidized Reactor For Lunar Oxygen Production
SBC: Carbotek Inc Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
HIGH-INERTIA ROTOR & HIGH-SPEED HIGH-ATTITUDE LONG-RANGE CRUISE GYROPLANE
SBC: CARTER AVIATION TECHNOLOGIES, LLC Topic: N/AN/A
SBIR Phase II 1997 National Aeronautics and Space Administration -
Thermal Spray Of Titanuim Adherends For High-Temperature Adhesive Bonding
SBC: DACCO SCI, INC. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
An Architecture For Autonomous Spacecraft Engineering Data
SBC: Daedalian System Corp Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Ultralight Inflatable Fresnel Lens Solar Concentrators For Space Power
SBC: ENTECH, Inc. Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
Integration Of Process Based Cost (Pbc) Models Into Robust Design Simulation (Rds) For Aircraft Life Cycle Cost Analysi
SBC: Executive Aerosystems Inc Topic: N/AN/A
SBIR Phase I 1997 National Aeronautics and Space Administration -
OPEN CORE ROTATOR
SBC: Fare Inc Topic: N/AN/A
SBIR Phase II 1997 National Aeronautics and Space Administration