You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    IMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD

    SBC: International Sensor            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS

    SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY            Topic: N/A

    ACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    THE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government