You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AIMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS
SBC: UES INC Topic: N/ATHE PROBLEM ADDRESSED IS THAT FUTURE NUCLEAR POWER PLANT CONTROL ROOM OPERATOR WORKLOAD WILL CONSIST PRIMARILY OF PASSIVE MONITORING FOR EXTENDED PERIODS OF TIME. THIS WILL RESULT IN DIFFICULTY MAINTAINING OPERATOR ALERTNESS AND PERFORMANCE CAPABILITY. THE TWO OBJECTIVES OF THIS PROJECT ARE TO PROVIDE THE CAPABILITY TO PREDICT AND EVALUATE THE EFFECT OF WORK UNDERLOADON HUMAN PERFORMANCE IN NPP CO ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS
SBC: Entropic Systems, Inc. Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES
SBC: FOSTER-MILLER, INC. Topic: N/ASTEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE
SBC: FOSTER-MILLER, INC. Topic: N/AON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
EVALUATION OF GENERAL FAILURE TYPES IN SAFETY ANALYSIS
SBC: John Wreathall & Company Topic: N/ATHIS WORK IS TO DEVELOP A METHOD TO IMPROVE THE ABILITY OF THE USNRC TO EVALUATE THE OPERATIONAL SAFETY SIGNIFICANCE OF OCCURANCES AT NUCLEAR POWER PLANTS. PERHAPS THE AREA OF GREATEST SAFETY SIGNIFICANCE IS HUMAN PERFORMANCE, BUT THE TECHNIQUES USED BY NRC DO NOT EVALUATE HUMAN PERFORMANCE IN ANY SYSTEMIC WAY. THE WORK IS PROPOSED TO BE PERFORMED IN THREE STAGES, AND BUILDS ON METHODS THAT HAVE B ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS
SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY Topic: N/AACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
HIGH SENSITIVITY LANDFILL MONITOR
SBC: Shonka Research Associates Topic: N/ATHE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...
SBIR Phase II 1992 Nuclear Regulatory Commission