You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ATHIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
GAMMA RAY SPECTROMETER/DOSIMETER
SBC: Applied Inventions Corp. Topic: N/AN/A
SBIR Phase I 1990 Nuclear Regulatory Commission -
OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT
SBC: CHARLES RIVER ANALYTICS, INC. Topic: N/ATHE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...
SBIR Phase I 1993 Nuclear Regulatory Commission -
ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS
SBC: Entropic Systems, Inc. Topic: N/ATHE PROPOSED RESEARCH ADDRESSES THE APPLICATION OF ESI'S ENHANCED PARTICLE REMOVAL TO THE NON-DESTRUCTIVE DECONTAMINATION OF NUCLEAR EQUIPMENT. IN THIS PROCESS, THE PART TO BE CLEANED IS CONTACTED, UNDER CONDITIONS OF SHEAR, WITH A SOLUTION OF A HIGH MOLECULAR WEIGHT FLUOROCARBON SURFACTANT IN AN INERT PERFLUORINATED LIQUID. IT IS THEN RINSED WITH PERFLUORINATED LIQUID AND AIR DRIED. THE PERFLUORI ...
SBIR Phase II 1993 Nuclear Regulatory Commission -
Inservice Diagnostics of Motor Operated Valves
SBC: ACENTECH INCORPORATED Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION
SBC: Shonka Research Associates Topic: N/ATWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.
SBIR Phase II 1990 Nuclear Regulatory Commission -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION
SBC: Shonka Research Associates Topic: N/ATHIS PROJECT WILL RESEARCH AND DEVELOP A FLOOR MONITOR FOR QUICK DETERMINATION OF RADIOACTIVE CONTAMINATION. THE MONITOR WILL UTILIZE A NEW PORTABLE TECHNOLOGY (INCLUDING SUPPORT ELECTRONICS). IT WILL HAVE THE CAPABILITY TO MEASURE BETA CONTAMINATION BELOW 5000 DPM/100 CM SQUARED WHEN AVERAGED OVER ONE SQUARE METER AND COVER AN AREA AS LARGE AS SEVERAL SQUARE FEET PER SECOND. IT WILL ALSO BE CAPAB ...
SBIR Phase II 1993 Nuclear Regulatory Commission -
SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION
SBC: Shonka Research Associates Topic: N/AIMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...
SBIR Phase II 1994 Nuclear Regulatory Commission