You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  3. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  5. TWO NEW NDE TECHNIQUES FOR INSPECTION OF CONTAINMENT WELDS BENEATH COATINGS

    SBC: PHYSICAL RESEARCH, INC.            Topic: N/A

    INSPECTION OF PAINTED OR COATED CARBON STEEL SURFACES OFTEN INVOLVES THE REMOVAL OF THE COATING PRIOR TO INSPECTION, ESPECIALLY WHEN THE USE OF MAGNETIC PARTICLE TESTING (MT) IS REQUIRED. IN THE CASE OF EXAMINATION OF CONTAINMENT VESSEL WALLS IN NUCLEAR POWER PLANTS, THE REMOVAL IS TIME CONSUMING, RESULTING IN INCREASED RADIATION EXPOSURE TO WORKERS. IN ADDITION, THE REMOVAL MUST BE DONE WITHOUT C ...

    SBIR Phase II 1990 Nuclear Regulatory Commission
  6. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. LONG RANGE RADIOACTIVE PLUME TRANSPORT SIMULATION MODEL/CODE

    SBC: Sigma Research Corp            Topic: N/A

    THE OBJECTIVE OF THE PHASE I RESEARCH IS TO DETERMINE THE TECHNICAL FEASIBILITY OF THE DEVELOPMENT OF A LONG RANGE RADIOACTIVE PLUME TRANSPORT MODEL/CODE FOR THE NRC. THIS CODE WOULD BE USED TO SIMULATE THE MOVEMENT, DISPERSION, DECAY, AND DEPOSITION OF RADIONUCLIDES RELEASED FROM SEVERE NUCLEAR REACTOR ACCIDENTS, SUCH AS THE CHERNOBYL ACCIDENT. IT IS DESIRED THAT ALL RELEVANT PHYSICAL AND CHEMICA ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government