You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. CHARACTERIZATION OF CONCRETE CONDITION USING ACOUSTIC TOMOGRAPHIC IMAGING

    SBC: Atkinson-noland Assoc. Inc.            Topic: N/A

    RESIDUAL LIFETIME EVALUATION OF EXISTING NUCLEAR FACILITIES REQUIRES DETAILED INFORMATION REGARDING CONDITION OF CONTAINMENT AND SUPPORT STRUCTURES. CURRENT NONDESTRUCTIVE METHODS FOR SUBSURFACE EVALUATION OF REINFORCED CONCRETE USE COMPLEX EQUIPMENT AND RELY HEAVILY ON INTERPRETATION BY THE OPERATOR. A RESEARCH EFFORT IS PROPOSED TO EXAMINE THE USE OF COMPUTERIZED TOMOGRAPHIC IMAGING FOR LOCATING ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  3. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS

    SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY            Topic: N/A

    ACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. TASK NETWORK MODELING OF HUMAN OPERATIONS IN NUCLEAR POWER PLANT CONTROL ROOMS

    SBC: Micro Analysis & Design Inc            Topic: N/A

    THE PURPOSE OF THIS EFFORT IS TO STUDY THE FEASIBILITY OF AND, HOPEFULLY, VALIDATE THE USE OF TASK NETWORK MODELING TOSTUDY HUMAN FACTORS IN THE CONTROL ROOM. TASK NETWORK MODELING EXTENDS A HUMAN ENGINEERING TASK ANALYSIS INTO A COMPUTER MODEL. WE PROPOSE THAT PERTURBING THE INDIVIDUAL TASKS IN A TASK NETWORK MODEL IN A MANNER PREDICTED FROM CONTROL ROOM DESIGN CHANGES, TASK AUTOMATION, OR THE CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  9. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government