You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    IMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  4. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  5. WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS

    SBC: UES INC            Topic: N/A

    THE PROBLEM ADDRESSED IS THAT FUTURE NUCLEAR POWER PLANT CONTROL ROOM OPERATOR WORKLOAD WILL CONSIST PRIMARILY OF PASSIVE MONITORING FOR EXTENDED PERIODS OF TIME. THIS WILL RESULT IN DIFFICULTY MAINTAINING OPERATOR ALERTNESS AND PERFORMANCE CAPABILITY. THE TWO OBJECTIVES OF THIS PROJECT ARE TO PROVIDE THE CAPABILITY TO PREDICT AND EVALUATE THE EFFECT OF WORK UNDERLOADON HUMAN PERFORMANCE IN NPP CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government