You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
NEW SENSOR FOR MEASUREMENT OF AIR MOVEMENT
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ATHIS PROPOSAL IS PREPARED IN DIRECT RESPONSE TO THE NRC'S SOLICITATION FOR AN IMPROVED DEVICE TO MEASURE AIR MOVEMENT FOR PERSONNEL RADIATION PROTECTION AND HEALTH PHYSICS APPLICATIONS IN NUCLEAR FACILITIES. THE PURPOSE OF THE NEW DEVICE IS TO PROPERLY LOCATE AIR SAMPLERS SO THAT THE AIR SAMPLED IS REPRESENTATIVE OF THE AIR INHALED BY WORKERS. ALTHOUGH AIR FLOW RATE SENSORS SUCH AS ANEMOMETERS ARE ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1991 Nuclear Regulatory Commission -
DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1986 Nuclear Regulatory Commission -
EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR
SBC: K E M P CORP Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
A TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE.
SBC: Rem Technologies Inc. Topic: N/AA TEST METHOD FOR RELIAVLY AND EASILY EVALUATING THE CONDITION OF A REACTOR COOLANT PUMP (RCP) SHAFT WHEN THER E IS ONLY LIMITED ACCESS TO THE SHAFT AT THE COUPLING WOULD ENABLE THE NUCLEAR INDUSTRY TO EVALUATE THESE SHAFT SYSTEMS ON SITE. THIS PROJECT PROVIDES A TESTING METHOD WHICH CAN BEAPPLIED TO IDENTIFY THE PRESENCE, SIZE, AND LOCATION OF SHAFT CRACKS IN A VERTICAL RCP SHAFT SYSTEM. CONFIRMA ...
SBIR Phase I 1986 Nuclear Regulatory Commission -
IZATION
SBC: Waste Management Group Inc. Topic: N/AAT PRESENT, THE INDUSTRY USES MANY DIFFERENT METHODS TO CHARACTERIZE HARDWARE IN TERMS OF TIS RADIONUCLIDE CONTENT AT THE TIME OF DISPOSAL. ALL OF THES METHODS INVOLVE SOME FORM OF COMPONENT RADIATION PROFILING TO OBTAIN CO-60 ES ESTIMATES COUPLED WITH SCALING OF 10CFR PART 61 LONG LIVED NUCLIDES FOUND IN HARDWARE. UNDERWATER RADIATION PROFILES ARE OBTAINED UNDER DIFFERENT CONDITIONS, WITH DIFFERE ...
SBIR Phase I 1986 Nuclear Regulatory Commission