You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WE PROPOSE TO INVESTIGATE VARIOUS CONTROL METHODS BY WHICH THE POWER FACTOR OF AN INDUCTION GENERATOR CAN BE REGULATED TO ACHIEVE ENCHANCED POWER CONVERSION EFFICIENCY.

    SBC: Emd            Topic: N/A

    WE PROPOSE TO INVESTIGATE VARIOUS CONTROL METHODS BY WHICH THE POWER FACTOR OF AN INDUCTION GENERATOR CAN BE REGULATED TO ACHIEVE ENCHANCED POWER CONVERSION EFFICIENCY. IN PARTICULAR, THIS STUDY WILL FOCUS UPON VARIABLE GENERATOR TERMINAL VOLTAGE CONTROL TO ACCOMPLISH THESE GOALS. VARIOUSCONTROL STRATEGIES WILL BE DEVELOPED IN ORDER TO IDENTIFY THE MOST COST-EFFECTIVE AND RELIABLE METHODS FOR TEST ...

    SBIR Phase I 1986 Department of Energy
  2. SHORT-LIVED ISOTOPE TECHNOLOGY FOR EVALUATING PLANT GENOTYPE RESPONSES TO DROUGHT AND CO2 STRESSES

    SBC: Phytoresource Research Inc            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of Energy
  3. Semiconductor Strain Gauge Based Pressure Transducer for Use in Borehole Seismics

    SBC: Tomoseis, Inc.            Topic: N/A

    40837 November 13, 1996 TomoSeis, Inc. Crosswell Seismic Imaging holds great promise for imaging the region between existing oil wells to incrementally increase the recovery of the 368 billion barrels of oil still in the ground (of the 500 billion barrels of original oil in place in the U.S.). To make crosswell data acquisition cost effective, surveys mu ...

    SBIR Phase I 1996 Department of Energy
  4. REDESIGN OF AMMONIA ABSORPTION REFRIGERATION UNITS FOR LOW TEMPERATURE APPLICATIONS IN NATURAL GAS PROCESSING

    SBC: Process Technology Inc.            Topic: N/A

    GAS TRANSMISSION PIPELINES REQUIRE NATURAL GAS DELIVERED TO THEM TO MEET A HYDROCARBON (HC) DEWPOINT SPECIFICATION IN ORDER THAT THE HC LIQUIDS ARE NOT DROPPED OUT IN THE LINE DURING TRANSMISSION. SIMILAR SPECIFICATIONS ARE IMPOSED BY PLANT OPERATORS ON THE FUEL GAS THAT IS CONSUMED BY THEIR MACHINERY. A MARKET EXISTS FOR AN ECONOMICAL AMMONIA (NH3) ABSORPTION UNIT TO REPLACE COMPRESSION UNITS U ...

    SBIR Phase I 1994 Department of Energy
  5. "Development of Energy Recovery, RF Power Rectifiers for Intense Particle Beam Applications"

    SBC: Linac Systems            Topic: N/A

    143 "Development of Energy Recovery, RF Power Rectifiers for Intense Particle Beam Applications"--Linac Systems, 2167 North Highway 77, Waxahachie, TX 75165-6215; (972) 937-3283 Dr. Donald A. Swenson, Principal Investigator Mrs. Barbara C. Swenson, Business Official DOE Grant No. DE-FG03-97ER82415 Amount: $74,980 Intense particle beam facilities, such as free-electron lasers, suggest the ne ...

    SBIR Phase I 1997 Department of Energy
  6. OLIGONUCLEOTIDE LIBRARIES FOR HIGH THROUGHPUT DNA SEQUENCING

    SBC: Genosys Biotechnologies, Inc.            Topic: N/A

    A PROPRIETARY MULTIPLE-DNA SYNTHESIS INSTRUMENT IS EMPLOYED IN PHASE I OF THIS PROJECT TO SYNTHESIZE THE LIBRARY OF 3,314 NONAMER OLIGONUCLEOTIDES AS SPECIFIED FOR USE IN HIGH THROUGHPUT GENOME SEQUENCING BY A CONTINUOUS "PRIMER WALKING" APPROACH. THE OLIGONUCLEOTIDES ARE SYNTHESIZED AT A RATE OF 100 PER DAY, AFFINITY-PURIFIED BY RPL REVERSE-PHASE CARTRIDGE CHROMATOGRAPHY, QUANTIFIED AND ALIQUOTED ...

    SBIR Phase I 1991 Department of Energy
  7. Novel Separation Method Based On The Electrosynthesis of Dual Oxidants

    SBC: LYNNTECH INC.            Topic: N/A

    11 Novel Separation Method Based On The Electrosynthesis of Dual Oxidants--Lynntech, Inc., 7610 Eastmark Drive, Suite 105, College Station, TX 77840-4024; (409) 693-0017 Dr. Adrian Denvir, Principal Investigator Dr. Oliver J. Murphy, Business Official DOE Grant No. DE-FG03-97ER82421 Amount: $75,000 There are 110 million cubic meters of groundwater and surface water on Department of Ene ...

    SBIR Phase I 1997 Department of Energy
  8. Novel Proton Exchange Membrane (PEM) for Fuel Cell Application

    SBC: LYNNTECH INC.            Topic: N/A

    40394 November 18, 1996 Lynntech, Inc. Due to their high power density for both stationary or mobile applications, fuel cells employing solid polymer electrolytes have promising applications ranging from portable power sources to electric vehicles to commercial buildings. In a fuel cell, a solid polymer electrolyte should function as an acid electrolyte, ...

    SBIR Phase I 1996 Department of Energy
  9. Noncontact Viscosity Measurement of Molten Glass Using Laser-Generated Ultrasound for Process Control During Melting and Forming Operations

    SBC: KARTA TECHNOLOGIES            Topic: N/A

    40879 November 13, 1996 Karta Technology, Inc. In almost all glass-manufacturing processes, production yield depends critically on the viscosity of the melt. Because the glass viscosity is a function of temperature, most active control systems monitor the temperature of the molten glass. However, temperature readings are not reliable for measuring viscos ...

    SBIR Phase I 1996 Department of Energy
  10. High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
US Flag An Official Website of the United States Government