Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition
SBC: Cm Consulting Topic: N/AThe final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...
SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense -
Porous Sol-Gel Derived Ceramic Release Agent
SBC: T P L, INC Topic: N/ABreathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER
SBC: Shonka Research Associates Topic: N/ATHE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...
SBIR Phase I 1990 Nuclear Regulatory Commission