You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Real Time Collective Peformance Feedback for Combat

    SBC: FSCX, INC.            Topic: N/A

    "Army Transformation efforts and the ongoing digitization of the battlespace have created a situation where much of the data needed to create automated AAR products in training environments is now available in actual combat environments. Using AAR systemsas operational tools, we now have the opportunity to provide military organizations with AAR-like products and operational feedback in time for ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  3. Dismounted Infantry Situational Awareness Assessment in

    SBC: SA Technologies, Inc.            Topic: N/A

    "We propose to develop a comprehensive team SA measurement system to provide direct insight into soldier dynamic knowledge and decision skills at various levels of small squad command and in major types of military operations in urban terrain (MOUT). Thesystem will integrate a real-time measure of team SA for use during soldier immersion in VR simulators and a post-immersion measure for integrati ...

    SBIR Phase I 2002 Department of DefenseOffice of the Secretary of Defense
  4. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government