You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. GNSS Radio Occulation Receiver

    SBC: 3s Navigation (dba For            Topic: N/A

    The proposed effort is to design a space-qualified dual-frequency GPS/GLONASS receiver with enhanced capabilities for atmospheric remote sounding. While such soundings have been performed using GPS-only receivers, a space-based GPS/GLONASS receiver would be superior in terms of coverage and integrity cross- checking, as well as the ability to process the unencrypted GLONASS L2 signal. This design ...

    SBIR Phase I 1997 Department of Commerce
  3. Self-Calibration and Error Analysis for 2D Measurements

    SBC: Aracor            Topic: N/A

    Two-dimensional measurement machines, such as microlithography and computed tomography systems, are subject to distortions in the measurement field due to imperfections in their hardware and software. Certified methods to characterize and quantify such distortions are urgently needed. An innovative self- calibrating scheme is tendered which eliminates the disadvantages of previous self-calibration ...

    SBIR Phase I 1997 Department of Commerce
  4. X-RAY SOURCE ENHANCEMENT FOR ANALYTICAL INSTRUMENTATION

    SBC: Aracor            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Commerce
  5. NEURAL NETWORK APPLICATIONS FOR CLOUD-TRACK WIND DETERMINATION

    SBC: ATMOSPHERIC & ENVIRONMENTAL RESEARCH, INC.            Topic: N/A

    WE PROPOSE TO APPLY ARTIFICIAL NEURAL NETWORKS TO THE DERIVATION OF CLOUD MOTION VECTORS FROM SATELLITE IMAGERY. IN PHASE I, WE WILL CONCENTRATE ON USING A NEURAL NETWORK IN THE FIRST STEP IN THE DERIVATIO OF CLOUD MOTION VECTORS, THE HEIGHT ASSIGNMENT AND TARGET SELECTION. THE NEURAL NETWORK COMBINES, AT EACH IMAGE PIXEL, BRIGHTNESS IN DIFFERENT CHANNELS TO DETERMINE CLOUD TYPE AND LEVEL (I.E., L ...

    SBIR Phase I 1994 Department of Commerce
  6. Electromagnetic Detection of Tornadoes

    SBC: Airborne Research Associates            Topic: N/A

    The ultimate objective of this project is to develop an instrument capable of remote detection and location of tornadoes and/or storms containing tornadoes. There are many reports, both scientific and anecdotal, suggesting that tornadoes and tornadic thunderstorms emit anomalous electromagnetic (EM) radiation-both RF and luminous. This radiation is characterized by unusually high rates of EM pulse ...

    SBIR Phase I 1997 Department of Commerce
  7. High Resolution Semiconductor Gamma Ray Detectors for Radionuclide Metrology

    SBC: RADIATION MONITORING DEVICES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Commerce
  8. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. AUTOMATED AIRBORNE TUNA SCHOOL DETECTOR

    SBC: Arete Associates            Topic: N/A

    THERE IS A NEED TO REDUCE DOLPHIN BYCATCH IN THE TUNA PURSE SEINE FISHERY IN THE ETP AND IMPROVE THE SEARCHING EFFICIENCY FOR TUNAS NOT ASSOCIATED WITH DOLPHINS. ARETE PROPOSES TO DESIGN IN PHASE 1 A PROTOTYPE AIRBORNE PASSIVE DAYTIME MULTISPECTRAL IMAGING SYSTEM FOR IMPROVING THE SEARCHING EFFICIENCY FOR TUNAS NOT ASSOCIATED WITH DOLPHINS. THIS EFFORT INCLUDES AIRBORNE COLLECTION OF OCEAN VIDEO D ...

    SBIR Phase I 1994 Department of Commerce
  10. ADVANCED SYSTEM FOR MINEHUNTING AND OCEANOGRAPHIC REMOTE SENSING

    SBC: Atlantic Applied Research Corp            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Commerce
US Flag An Official Website of the United States Government