You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Feasibility of Using Impulse Radar to Detect and Identify Detonators

    SBC: AKELA INC            Topic: N/A

    This proposal seeks to demonstrate the feasibility of using impulse radar techniques to detect and identify explosive detonators. It relies on the fact that a radar impulse will excite natural electromagnetic resonances which characterize the size, shape, and material composition of an object. These resonances are present in the scattered transient return from the object and can be extracted by ...

    SBIR Phase I 1996 Department of Transportation
  2. REMOTE AERIAL INSPECTION OF BRIDGES

    SBC: Aca Industries, Inc.            Topic: N/A

    OF THE OVER 600,000 HIGHWAY BRIDGES AND APPROXIMATELY 100,000 RAILROAD BRIDGES IN THE U.S., MANY ARE DIFFICULT TO INSPECT BECAUSE OF LIMITED ACCESSIBILITY. REMOTE INSPECTIONBY UNMANNED AERIAL VEHICLES MAY PROVIDE A SOLUTION TO THIS PROBLEM, BUT INVOLVES CONSIDERATIONS OF VEHICLE SUITABILITY (HELICOPTER, BLIMP DUCTED FAN VEHICLE), THE BRIDGE LOCAL ATMOSPHERIC ENVIRONMENT, AND THE TYPE OF CONTROL (R ...

    SBIR Phase I 1990 Department of Transportation
  3. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. A TUNABLE, MONOCHROMATIC X-RAY GENERATOR FOR EXPLOSIVES DETECTION

    SBC: ADELPHI TECHNOLOGY INC            Topic: N/A

    PARAMETRIC X-RADIATION (PXR) IS PROPOSED AS AN INTENSE, TUNABLE, MONOCHROMATIC HARD-X-RAY SOURCE FOR THE DETECTION OF EXPLOSIVES. THIS RADIATION IS HIGHLY COLLIMATED, HAS A BANDWIDTH OF 0.1, AND AN INTENSITY EQUAL TO THAT OF SYNCHROTRON RADIATION ON A PER ELECTRON BASIS. PXR GENERATION IS ACHIEVED BY PLACING CRYSTALS INTO THE PATH OF ELECTRON BEAMS WITH ENERGY OF 6 MEV OR GREATER. THE VIRTUAL PHOT ...

    SBIR Phase I 1994 Department of Transportation
  5. ICING PREVENTION BY NUCLEATION OF ICE PARTICLES IN FRONT OF SUBSONIC AIRCRAFT

    SBC: AERODYNE RESEARCH INC            Topic: N/A

    WE PROPOSE THE INVESTIGATION OF NUCLEATION PROCESSES CAPABLEOF CAUSING THE FREEZING OF SUPERCOOLED WATER DROPLETS IN FRONT OF A MOVING SUBSONIC AIRCRAFT. THE GOAL IS TO DEVELOPA NUCLEATION MECHANISM CAPABLE OF FREEZING THE WATER DROPLETS FAR ENOUGH IN FRONT OF THE MOVING PLANE SO THAT BY THE TIME THE PLANE REACHES THE DROPLETS THEY ARE FROZEN AND BOUNCE FROM THE LEADING EDGES AND THE IMPENAGE, WIT ...

    SBIR Phase I 1990 Department of Transportation
  6. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  7. DEVELOPMENT OF LOW POWER DIGITAL COMMUNICATION (LPDC) SYSTEM

    SBC: Amerasia Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  8. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. HYBRID METHOD FOR ASSESSMENT OF COGNITIVE REHEARSAL PROFICIENCY MAINTENANCE.

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    WE PROPOSE TO IDENTIFY THE EFFECT OF COGNITIVE REHEARSAL ON REGAINING AND MAINTAINING FLYING SKILLS. BY COGNITIVE REHEARSAL (CR) WE MEAN ACTIVITIES PERFORMED BY THE FAA INSPECTOR DURING FLIGHT PROFICIENCY CHECKS SUCH AS CHECKLIST VERIFICATION, VERIFICATION OF ABNORMAL PROCEDURE EXECUTION, AND THE LIKE. PRECISE DATA ABOUT THE TYPES OF SKILLS MAINTAINED VIA CR, THE RATE OF DECAY OF THE SKILLS NOT MA ...

    SBIR Phase I 1994 Department of Transportation
  10. PROPOSAL TO DEVELOP A COMPREHENSIVE FREIGHT INFORMATION SYSTEM

    SBC: Colography Group Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
US Flag An Official Website of the United States Government