You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  2. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES

    SBC: Guyer Santin, Inc.            Topic: N/A

    THIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  9. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  10. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government