You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Optoelectronic Packaging for Through-Substrate Communications

    SBC: Abj Integration Technologies,            Topic: N/A

    ABJ Integration Technologies, Inc. proposes to model a vertically optically interconnected stack of silicon integrated circuits to form a three dimensional system. This 3D system will utilize through-substrate optoelectronic communication to which the package and silicon are optically transparent. System optimization for user specifications will include materials and components such as emitters ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. Low Complexity Adaptive Algorithms for Airborne ECCM

    SBC: Adaptronics, Inc.            Topic: N/A

    Recent research has shown that effective jammer and clutter suppression is best performed with fully space-time adaptive processing. However, allowing adaptive weights on every tap on every element is computationally prohibitive and requires too many samples to converge. Eigenvalue analysis shows that the required number of degrees of freedom (DOF) is significantly less than the dimensionality of ...

    SBIR Phase I 1994 Department of DefenseAir Force
  3. Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  4. LIGHT-WEATHER DATABASE FOR REENTRY TECHNOLOGIES

    SBC: Aeromet, Inc.            Topic: N/A

    DEVELOPMENT OF A PLAN AND ITS DEMONSTRATION IN PRODUCING MODERN DATABASE FOR RV TECHNOLOGIES IS PROPOSED BY USING CLOUD MICROPHYSICAL DATA SETS COLLECTED SINCE 1985 OVER THE NORTH AMERICAN CONTINENT AND U.S. ARMY KWAJALEIN ATOLL. THE PLAN INCLUDES THE USE OF AIRBORNE RADAR, MODELING, AND SATELLITE ADDITIONS TO THE PARTICLE SIZE DATA TO CORRELATE PARTICLE SIZE AND LIQUID WATER CONTENT OVER AN EXTEN ...

    SBIR Phase I 1990 Department of DefenseAir Force
  5. SATELLITE KILL ASSESSMENT SPECTROSCOPY

    SBC: Aeromet, Inc.            Topic: N/A

    TO MEET THE KINETIC ENERGY ANTI-SATELLITE (KE ASAT) REQUIREMENTS FOR TIMELY AND RELIABLE KILL ASSESSMENT, AEROMET PROPOSES TO RECOMMEND INNOVATIVE TECHNIQUES IN REAL-TIME KILL ASSESSMENT SPECTROSCOPY. BECAUSE IT CAN BE CRITICALLY IMPORTANT TO ACCURATELY VERIFY SATELLITE ELIMINATION, A KILL ASSESSMENT SYSTEM MUST DISCERN BETWEEN VARIOUS HIT AND MISS PHENOMENA, INCLUDING THE USE OF POTENTIAL COUNTER ...

    SBIR Phase I 1990 Department of DefenseArmy
  6. RADIO FREQUENCY HAZARD MONITORING- USAKA

    SBC: Aeromet, Inc.            Topic: N/A

    AEROMET PROPOSES TO DEVELOP A SENSOR SYSTEM FOR THE PURPOSE OF MONITORING RF FIELD STRENGTH ENERGY. PHASE I WILL CONCENTRATE ON THE DESIGN AND DEVELOPMENT OF A UNIQUE PROGRAMMABLE SENSOR THAT CAN SENSE THE ENERGY IN VARIOUS FREQUENCY BANDS. THE SENSOR WILL ACT AS A STAND ALONE UNIT AND BE POWERED BY SOLAR CHARGED BATTERIES. THE SENSOR WILL BE DESIGNED SO THAT MANY OF THEM CAN BE OPERATED IN CONJUN ...

    SBIR Phase I 1991 Department of DefenseArmy
  7. Intelligent Contol for Automated Vehicles: A Decision-Aiding Method for Coordintion of Multiple Uninhabited Tactical Aircraft

    SBC: Veloxiti, Inc.            Topic: N/A

    An open problem confronting Uninhabited Tactical Aircraft (UTA) is the control concept for their successful operation in combat. Unlike reconnaissance UAVs, it will not be practical to operate UTAs with fully pre-programmed missions nor will it be possible to continuosly fly with them from remote cockpits. A new control paradigm is needed. One that supports a full range of intervention from dir ...

    SBIR Phase I 1996 Department of DefenseDefense Advanced Research Projects Agency
  8. DEVELOPMENT OF PLANNING SYSTEMS FOR PROBLEMS SUBJECT TO UNCERTAINTY AND RESOURCE SCARCITY

    SBC: Artificial Intelligence            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  9. Low Cost Curing and Repair Process for Composites

    SBC: ADVANCED PROCESSING TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseAir Force
  10. Fiber Optic Raman Sensors for the Remote Determination of Composite Chemical Characteristics

    SBC: ADVANCED PROCESSING TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseAir Force
US Flag An Official Website of the United States Government