You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. SYSTEM FOR ECONOMICALLY PRODUCING MARGINAL DEEPWATER GAS DISCOVERIES

    SBC: Atlantia Energy Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
  2. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  3. BOREHOLE PIEZOELECTRIC SOURCE FOR HIGH RESOLUTION SEISMIC APPLICATIONS

    SBC: High Resolution Seismics Inc            Topic: N/A

    THE U.S. HAS AN ESTIMATED 327 BILLION BARRELS OF OIL IN EXISTING PRODUCTION FIELDS WHICH REMAINS IN PLACE EVEN AFTERPRIMARY AND SECONDARY RECOVERY TECHNIQUES HAVE BEEN EMPLOYED. HIGH RESOLUTION BOREHOLE-TO-BOREHOLE SEISMIC TOMOGRAPHY CAN PROVIDE THE INFORMATION NEEDED TO LOCATE THESE UNPRODUCED REGIONS THROUGH THE IDENTIFICATION OF SUBTLE GEOLOGIC ANOMALIES AND CAN BE USED TO ASSESS THE PROGRESS O ...

    SBIR Phase I 1990 Department of Energy
  4. APPLICATION SPECIFIC, DISCRETE JUNCTION FET DESIGNED FOR USEIN LARGE PARTICLE DETECTOR PREAMPLIFIER CIRCUITRY

    SBC: Interfet Corp            Topic: N/A

    IMPROVED ELECTRONICS IN THE PREAMPLIFIER CIRCUIT OF CALORIMETER DETECTORS IS DESIRED TO IMPROVE THE ABILITY TO COLLECT DATA FROM HIGH ENERGY ACCELERATORS FOR PHYSICS EXPERIMENTS. EXTREMELY LOW NOISE AMPLIFICATION IS REQUIRED TO AVOID POOR SIGNAL TO NOISE RATIOS SINCE ANALOG SUMS OF ALL THE DETECTOR SIGNALS ARE PERFORMED FOR TRIGGER PURPOSES. FAST SIGNAL PROCESSING SPEED IMPOSED BY THE EVENT RATES ...

    SBIR Phase I 1990 Department of Energy
  5. ULTRA-HIGH-SPEED CHROMATOGRAPHY FOR MONITORING PHOTOCHEMICALDETOXIFICATION OF HAZARDOUS WASTES

    SBC: Ionics International, Inc.            Topic: N/A

    A MAJOR PROBLEM ASSOCIATED WITH THE USE OF ULTRA-HIGH-RESOLUTION GAS CHROMATOGRAPHY FOR EFFLUENT MONITORING IS THE RELATIVELY LOW SPEED OF ANALYSIS. WE PROPOSE TO DEVELOP AN ULTRA-HIGH-SPEED CAPILLARY GAS CHROMATOGRAPH WHICH WOULD BE SUITABLE FOR THE ANALYSIS OF EFFLUENT SAMPLES IN JUST A FEW SECONDS. THE HEART OF THE NEW INSTRUMENT WOULD BE A MICROBORE COLUMN WITH AN INTERNAL DIAMETER OF 50 MUM O ...

    SBIR Phase I 1990 Department of Energy
  6. A TECHNIQUE FOR MEASURING DIFFUSION OF HYDROGEN ISOTOPES IN OXIDES

    SBC: Ionwerks, Inc.            Topic: N/A

    SURFACE METAL OXIDE AND OXYHYDROXIDE LAYERS HAVE BEEN IMPLICATED AS TRITIUM TRAPS IN STAINLESS STEELS. A NEW TECHNIQUE IS BEING DEVELOPED FOR MEASURING HYDROGEN ISOTOPE DIFFUSION WITHIN THIS LAYER AND WITHIN PERMEATION BARRIERS MEANT TO LIMIT TRITIUM INVENTORY IN THESE MATERIALS.

    SBIR Phase I 1990 Department of Energy
  7. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. DEVELOPMENT OF A HIGHER PRESSURE ROTARY BLOWOUT PREVENTER FOR SAFE DIRECTIONAL DRILLING IN UNDERBALANCED APPLICATIONS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    THIS PROJECT IS AIMED AT THE DEVELOPMENT OF A NEW GENERATION OF ROTARY BLOWOUT PREVENTERS CAPABLE OF SAFE, RELIABLE, AND COST EFFECTIVE HANDLING OF THE HIGH PRESSURES EXPECTED IN UNDERBALANCED HORIZONTAL AND DIRECTIONAL DRILLING APPLICATIONS. PRESSURES OF UP TO 5,000 PSI (OR EVEN HIGHER) CAN BE EXPECTED WHEN DRILLING WITH AIR, FOAM, OR NITRIFIED MUD IN THE LOW PERMEABILITY FORMATIONS IN THE U.S. ...

    SBIR Phase I 1994 Department of Energy
  9. High Speed Bearing for Roller Cone Drill Bits Used in Hard Rock Drilling

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. DEVELOPMENT OF A NOVEL SEALED BEARING ASSEMBLY FOR IMPROVINGDOWNHOLE MOTOR PERFORMANCE IN DRILLING HORIZONTAL WELLS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Energy
US Flag An Official Website of the United States Government