You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Effective Math Instruction for Adult Learners on CD-ROM

    SBC: CompuTaught, Inc.            Topic: N/A

    The goal of this project is to improve remedial math instruction for adults by combining (a) an effective adult education model; (b) an effective instructional design method, with; (c) the multimedia capabilities of the computer. The innovative combination of these components will produce an effective math program designed specifically for adult learners that can be used at home, at school, or ...

    SBIR Phase I 1997 Department of Education
  2. A PROGRAMMABLE ELECTRONIC CUEING AID FOR INDIVIDUALS WITH COGNITIVE IMPAIRMENTS

    SBC: Deaton Ashcraft Group Inc.            Topic: N/A

    INDIVIDUALS WHO ARE BORN WITH MENTAL RETARDATION OR WHO SUSTAIN TRAUMATIC BRAIN INJURIES OFTEN ARE LEFT WITH COGNITIVE IMPAIRMENTS. THESE IMPAIRMENTS AFFECT THE INDIVIDUAL'S ATTENTION, ORIENTATION, MEMORY, VERBAL OR PERCEPTUAL ABILITIES, AND SOCIAL REASONING. PARTICULARLY, MANY INDIVIDUALS WITH COGNITIVE IMPAIRMENTS HAVE A POOR SENSE OF JUDGEMENT, DECISION MAKING, AND INITIATION. THUS, THEIR AB ...

    SBIR Phase I 1994 Department of Education
  3. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  4. A NOVEL MICROACTUATOR FOR THE REFRESHABLE BRAILLE DISPLAY SYSTEM

    SBC: ORBITAL RESEARCH INC            Topic: N/A

    THIS WORK WILL DEVELOP A NOVEL MICROACTUATOR MECHANISM FOR USE WITH A COMPUTER INTERFACED REFRESHABLE BRAILLE DISPLAY SYSTEM (RBDS). THE MICROACTUATOR WILL BE DESIGNED TO OPERATE WITHIN THE POWER LIMITATIONS OF THE RBDS. IT WILL ALSO BE DESIGNED TO MEET THE REFRESH AND RESPONSE RATES TOLERANCES WHICH HAVE BEEN ESTABLISHED DURING PHASE I. THE MICROACTUATOR WILL BE DESIGNED, AND A FABRICATION PLA ...

    SBIR Phase I 1994 Department of Education
  5. SPECIAL MONITOR DETECTOR DEVELOPMENT FOR RESPIRATOR CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    IMPLEMENTATION OF AN INTEGRATED DETECTION SYSTEM FOR CONTAMINATION MONITORING OF RESPIRATORS HAS BEEN PROBLEMATIC. BECAUSE OF THE COMPLEX SURFACES, HAND MONITORING USING PORTABLE SURVEY INSTRUMENTATION HAS BEEN THE PREFERRED METHOD. HAND MONITORING IS COSTLY IN TIME AND OFTEN FAILS TO RELIABLY ACHIEVE A GIVEN DETECTION LIMIT BECAUSE OF VARIABLES SUCH AS SURVEY SPEED ANDDISTANCE FROM THE PROBE. THE ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  6. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. WORK UNDERLOAD IN MODERN NPP CIBTRIK ROOMS

    SBC: UES INC            Topic: N/A

    THE PROBLEM ADDRESSED IS THAT FUTURE NUCLEAR POWER PLANT CONTROL ROOM OPERATOR WORKLOAD WILL CONSIST PRIMARILY OF PASSIVE MONITORING FOR EXTENDED PERIODS OF TIME. THIS WILL RESULT IN DIFFICULTY MAINTAINING OPERATOR ALERTNESS AND PERFORMANCE CAPABILITY. THE TWO OBJECTIVES OF THIS PROJECT ARE TO PROVIDE THE CAPABILITY TO PREDICT AND EVALUATE THE EFFECT OF WORK UNDERLOADON HUMAN PERFORMANCE IN NPP CO ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government