You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Optoelectronic Packaging for Through-Substrate Communications

    SBC: Abj Integration Technologies,            Topic: N/A

    ABJ Integration Technologies, Inc. proposes to model a vertically optically interconnected stack of silicon integrated circuits to form a three dimensional system. This 3D system will utilize through-substrate optoelectronic communication to which the package and silicon are optically transparent. System optimization for user specifications will include materials and components such as emitters ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. N/A

    SBC: ACG, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  3. N/A

    SBC: AEROMECHANICS, LLC            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  4. Advanced Technology Speech Recognition System

    SBC: Amdyne Corp            Topic: N/A

    This effort will integrate an advanced technology speech recognition system (SRS) with a computer-assisted contingency planning training model. The SRS makes use of algorithms developed in the Speech Technology and Research Labratory of SRI International. Its state-of-the-art approach provides significant improvements in accuracy and robustness over other approaches. It provides for speaker ind ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. Real-Time Monitoring System for Trace Chemical Vapors During Open Burning/Open Detonation (OB/OD)

    SBC: APPLIED ORDNANCE TECHNOLOGY            Topic: N/A

    Continuing efforts to develop useful and safe means of treating unserviceable, damaged or unused munitions and ordnance include the use of Open Burning/Open Detonation (OB?OD) technique. Although OB/OD techniques provide many advantages over other demil/disposal processes, increasing regulatory scrutiny is forcing OB/O facilities to limit or eliminate operations. In addition, data collection req ...

    SBIR Phase I 1996 Department of DefenseArmy
  6. N/A

    SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 Department of DefenseArmy
  7. Moving Target Indicator (MTI) Radar Target Tracking Using Context Constraints Derived from High Resolution SAR Imagery

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    Development of new algorithms for improved tracking of MTI data from airborne standoff platforms can be enabled by exploiting additional information extracted from multi-mode radar including both SAR image information and MTI. MTI radar is being increasingly used for tactical battlefield surveillance and several new Systems are reaching ICC which will provide continuous wide area surveillance. T ...

    SBIR Phase I 1997 Department of DefenseArmy
  8. High-Speed Laser Scanning Impact Scoring System

    SBC: AUTOMATED PRECISION, INC.            Topic: N/A

    A Phase I project to design and demonstrate the concept of a "high-speed laser scanning technology for the measurement" and reporting of the small fire arm scoring. Accuracy of the measurement is +/- 1 mm over an area of 30'x30' with a projectile velocity of up to 1,550 meter/second. The results of the Phase I program will provide crucial design guidelines for the construction of a full brassboa ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. Immersive Visualization of Complex Situations for Mission Rehearsal

    SBC: Cobalt Blue, Inc.            Topic: N/A

    The development of an immersive environment to visually simplify complex situations, by minimizing distractions and maximizing information presented to the user, promises to re-define the current man-machine computer interface. This proposal will define a prototype for a seated immersive interface to transport the user around in an artificial/virtual environment. The environment will surround th ...

    SBIR Phase I 1996 Department of DefenseArmy
  10. An Invariant Landmark Object Recognition Method based on Adaptive Receptive Field Model of Primate's VisualCortex

    SBC: COMPUSENSOR TECHNOLOGY CORP.            Topic: N/A

    There is a clear need for an effective method of invariant landmark recognition and place determination in the development of autonomous guidance of robotics vehicle. Due to the change of perspective of objects viewed from moving vehicle, invariance is a critical requirement in landmark recognition. Neurobiological research in 80s has found that the receptive fields in primate's visual cortex co ...

    SBIR Phase I 1996 Department of DefenseArmy
US Flag An Official Website of the United States Government