You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SURVEY AND EVALUATION OF TECHNIQUES FOR MEASUREMENT OF ACOUSTIC SENSOR POSITION IN LONG TOWED ARRAYS, USING INTERNAL OR EXTERNAL DATA OR
SBC: ADAPTIVE METHODS, INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseNavy -
SENSOR FUSION USING ELECTRO-OPTIC AND RADAR SIGNAL MODULATION DATA
SBC: ZIMMERMAN ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1991 Department of DefenseNavy -
INLINE GAS/AIR MONITORING SYSTEM FOR DEVELOPMENT AND SMALL SCALE PRODUCTION IN PROCESSING FACILITIES
SBC: APPLIED ORDNANCE TECHNOLOGY Topic: N/AThe implementation of new environmental and National Institute for Occupational Safety and Health (NIOSH) regulations due to take effect by the year 2000 make it imperative that industrial and manufacturing processing facilities take steps to monitor, characterize, and control stack emissions in accordance with EPA air permit requirements. Inline gas/air monitoring techniques that permit simultane ...
SBIR Phase I 1994 Department of DefenseNavy -
Advanced Gun Design for Naval Vessels
SBC: APPLIED ORDNANCE TECHNOLOGY Topic: N/AThe design of vertically firing gun is merely a simplified version of a normal large caliber gun system. The fixed orientation of the weapon simplifies the ammunition feed and loading system as well as eliminating the need for an equilibration The challenges of the current proposed system are presented by rate of fire, vertical height limitation, structural required to accomodate high loads o ...
SBIR Phase I 1996 Department of DefenseNavy -
AUTOMATED DETECTION AND IDENTIFICATION OF MATERIALS IN HYPERSPECTRAL IMAGES
SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC. Topic: N/AThe goal of this program is to develop and implement optimal spectral signature detection techniques which provide automated detection and identification of materials in hyperspectral image sequences. The requirement to detect, identify and discriminate materials is a common theme in many applications of imaging spectrometry. In general, materials of interest are often smaller than the spa ...
SBIR Phase I 1996 Department of DefenseNavy -
Automated Detection and Identification of Materials in Hyperspectral
SBC: APPLIED SIGNAL & IMAGE TECHNOLOGY, INC. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
AURAL PROCESSED SIGNALS FOR MINE DETECTION AND CLASSIFICATION
SBC: Ard Corp. Topic: N/AN/A
SBIR Phase I 1985 Department of DefenseNavy -
Conformal UHF SATCOM Antenna for Tactical Aircraft
SBC: ATLANTIC AEROSPACE ELECTRONICS CORP. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseNavy -
Determining the Optimal Mix of Manpower
SBC: Automation Management Topic: N/AThis effort is divided into two objectives: (1) develop the methodology to define the optimal manpower Mix, and (2) develop an approach to perform that methodology for Navy officer and enlisted billets. We define an optimal manpower Mix by creating an achievable force structure (or billet plan) that attains the Navy's strategic plan with as few people as possible, given a set of personnel policie ...
SBIR Phase I 1996 Department of DefenseNavy -
KENETIC CHAIN
SBC: BAND, LAVIS & ASSOC., INC. Topic: N/ATHE PROPOSED DEVELOPMENT INVOLVES THE CHARACTERIZATION, EVALUATION AND MODIFICATION OF A CHAIN -SHOCK ABSORBER UTILIZED COMMERCIALLY. THESE SHOCK ABSORBERS CAN BE ASSEMBLED AS "LINKS" TO FORM A LENGTH OF "CHAIN" WITH THE DESIRED SHOCK ABSORBING CHARACTERISTICS. THIS CHAIN CAN EITHER BE INCORPORATED BETWEEN THE SHIP-S ANCHORING CHAIN AND A BOUY, BETWEEN THE BOUY AND ITS ANCHOR, OR BETWEEN THE SHIP- ...
SBIR Phase I 1991 Department of DefenseNavy