You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. EXPERIMENTAL EVALUATION OF FIBER OPTIC PRESSURE SENSORS FOR NUCLEAR POWER PLANTS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    AS A RESULT OF RECENT PROBLEMS SUCH AS THE OIL LOSS PHENOMENON IN SOME MODELS OF ROSEMOUNT PRESSURE TRANSMITTERS, THE NUCLEAR INDUSTRY HAS BECOME INTERESTED IN FIBER OPTIC PRESSURE TRANSMITTERS. THESE TRANSMITTERS ARE POTENTIAL CANDIDATES TO REPLACE THE EXISTING PRESSURE TRANSMITTERS IN THE SAFETY AND NON-SAFETY SYSTEMS OF NUCLEAR POWER PLANTS. FURTHERMORE, FIBER OPTIC PRESSURE TRANSMITTERS MAY BE ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  2. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    WE PROPOSE TO EXPLOIT THE PROPERTIES OF OUR NEW, FAST, BRIGHT SCINTILLATOR, YAIO3:CE(+3) (YAP), TO CONSTRUCT A DETECTOR FOR PHOTONS WITH ENERGIES FROM 20 KEV TO 3 MEV. AN ARRAY OF THESE INDIVIDUAL DETECTORS WILL SERVE AS THE BASIS FOR A BROAD-BAND Y-RAY DOSIMETER CAPABLE OF MEASURING EXPOSURES FROM 5 MR/H TO 1 R/H AND EQUIVALENT DOSES FROM 5 X 10(-2) TO 10 (+4) MSV/H. THEA ADVANTAGES OF YAP SCINTI ...

    SBIR Phase II 1995 Nuclear Regulatory Commission
  3. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  5. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    A SELF-POWERED RADIATION DETECTOR THAT CAN BE USED TO DETECTTHE SOURCE POSITION IN INDUSTRIAL RADIOGRAPHIC EQUIPMENT IS NEEDED. SELF-POWERED DETECTORS HAVE TRADITIONALLY BEEN USEDINFLUX MAPPING SYSTEMS IN NUCLEAR REACTORS BECAUSE OF THEIR SIZE, RUGGEDNESS AND SIMPLICITY. THIS DETECTOR CONCEP PROVIDES THE UNIQUE OPPORTUNITY FOR THE DEVELOPMENT OF LARGECROSS SECTIONAL AREA DETECTORS THATCAN BE USED ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  6. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    SEVERAL STATES ARE CURRENTLY SEEKING MUCH-NEEDED NEW LOW-LEVEL RADIOACTIVE DISPOSAL SITES IN ACCORDANCE WITH THE LOW-LEVEL RADIOACTIVE WASTE POLICY ACT OF 1980. ANY NEW COMMERCIALREQUIREMENT THAT A SITE BE CAPABLE OF BEING MODELED AND THATITS PERFORMANCE BE ASSURED FOR 500 YEARS. FOR MOST SITES, THE HYDROGEOLOGICAL AND RADIONUCLIDE TRANSPORT CHARACTERIS- TICS OF THE UNSATURATED ZONE ARE MAJOR FACT ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  8. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    PERIODIC RESPONSE TIME TESTING HAS BEEN PERFORMED FOR THE PAST TWELVE YEARS ON THE SAFETY SYSTEM PRESSURE SENSORS IN MANY NUCLEAR POWER PLANTS. HOWEVER, THE RESULTS OF THESE TESTS ARE NOT RELIABLE FOR ASSESSMENT OF AGING EFFECTS. THEIS BECAUSE INADEQUATE METHODS AND PROCEDURES HAVE BEEN USED IN PERFORMING THE MAJORITY OF THE TESTS. THIS PROPOSAL OFFFERS AN EXPERIMENTAL RESEARCH PROJECT TO PROVIDE ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  9. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  10. Development of a Performance Assessment Process Controller

    SBC: Innovative Tech. Solutions            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government