You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
A Five Volt Lithium Battery
SBC: COVALENT ASSOC., INC. Topic: N/AIn this Phase I SBIR program we propose to develop a novel high voltage (5V) lithium-ion battery suitable for portable electronics equipmentand transportation applications. Lithium-ion batteries are already commercially available and typically consist of carbon anode, non-aqueous electrolyte and lithium transition metal oxide cathode such as LiCoO2, LiNiO2 or LiMnO4. These systems have an operat ...
SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense -
A Five Volt Lithium Battery
SBC: COVALENT ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense -
A High Efficiency, Wide Band Sound Projector for Acoustic Tomography and Global Ocean Monitoring
SBC: Webb Research Corp. Topic: N/AAn acoustic projector suitable for long range signaling in the ocean is described. The design employs a novel approach, which could result in projectors of high performance, high efficiency, operation at any depth, and substantially reduced cost. Resolution of short pulses fundamentally requires acoustic energy spread over a broad band. Traditionally this has been done with projectors that pe ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys
SBC: American Research Corporation of Virginia Topic: N/AThe trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...
SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense -
Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys
SBC: American Research Corporation of Virginia Topic: N/AN/A
SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense -
An Angular Multiplexed Holographic Memory System Based on a Compact High-Speed Electro-Optic Beam Deflector
SBC: RADIANT RESEARCH, INC. Topic: N/ACurrent angular multiplexed holographic memory systems are facing obstacles in the area of dynamic control of two dimensional page oriented data. In order to massively store high density two-dimensional images and access all these stored images in a very short time without any moving parts, an innovative page-addressing delfector is required. Existing page-addressing deflectors requires a moving ...
SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense -
AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER
SBC: W Peter Trower Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/ATHE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...
SBIR Phase II 1994 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission