You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  2. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    THERE HAS RECENTLY BEEN HEIGHTENED CONCERN FOR THE POSSIBILITY THAT NUCLEAR POWER-PLANT ACCIDENTS DURING SHUTDOWNS COULD BE IMPORTANT CONTRIBUTORS TO THE OVERALL RISK PROFILE OF THESE PLANTS. THE 1986 SOVIET ACCIDENT AT CHERNOBYL WAS THE PRINCIPAL EVENT THAT LED TO THIS HEIGHTENED CONCERN, BUT A FEW RECENT EVENTS AT U.S. PLANTS HAVE ALSO CONTRIBUTED. TODAY, IT IS WIDELY UNDERSTOOD THAT THE RISK OF ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  3. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
  4. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA

    SBC: Modeling & Computing Services            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    THE PROPOSED RESEARCH WILL PROVIDE PROOF OF PRINCIPLE OF NEWRADIATION DETECTION TECHNOLOGY THAT WHEN FULLY DEVELOPED WILL PREVENT INADVERTENT DISPOSAL OF RADIOACTIVE MATERIAL INLANDFILLS AND SEWAGES. THE TECHNOLOGY WILL PROVIDE ORDER OFMAGNITUDE IMPROVEMENT IN DETECTION OVER CONVENTIONAL SYSTEMS. THE TECHNOLOGY WILL PROVIDE FIELD RUGGED AND COST COMPETITIVE DEVICES. THE PROPOSED RESEARCH WILL PROV ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  7. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  8. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  9. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  10. DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government