You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Software reusability

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    A major problem in reusability is the creation of components that can be reused in applications other than the application for which they were originally designed. Software reusability has long held out the unrealized promise of increased productivity. It is accepted that within product development, reusing of software components will greatly reduce time and thus save money. It is our belief that ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  2. Rapid Target Modeling Through GET Inheritance Mechanism

    SBC: DATAMAT SYSTEMS RESEARCH, INC.            Topic: N/A

    The objective of this project is to develop a Genetic Evolution Target (GET) modeling methodology for rapid target model development and validation from limited initial sensory and technical data. Developed methodology will allow for an expansion of the initial signature database and extensive testing of ATR systems over a variety of realistic signatures and situations not seen so far. The metho ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  3. Miniature, Affordable Satellite Beacon

    SBC: Eagle Eye Location Services            Topic: N/A

    Eagle Eye will develop a highly reliable, miniature transponder that will permit a user to accurately locate the transponder using a satellite communication system. The transponder will be small enough to fit inside a wristwatch case and it could be worn on a wrist or packaged into an inconspicous place in a sensitive piece of hardware. In the event that a person such as a Special Forces operative ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
  4. Wrist Sensor for Warfighter Status Monitor

    SBC: EMPIRICAL TECHNOLOGIES CORPORATION            Topic: N/A

    A small, personnel, battlefield, fiber optic sensor for detection of heartbeat and respiration rates will be developed. This biosensor offers high sensitivity, simplicity of design, and low costs. The contractor will show the feasibility of a personnel biosensor which has the potential to signal fatigue, dehydration, stress, illness, injury, or sleep disorders which are detectable through low fr ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  5. Video Retrieval Based on Language and Image Analysis

    SBC: Advance, Inc.            Topic: N/A

    We propose to develop practical video libraries allowing users to quickly find useful material. Commercial, home, or surveillance video programming captures information in multiple tracks: picture, sound, and closed captioning. Using multiple modalities cataloging information, visual information, and audio information is critical since no one track contains necessary information to identify clip ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  6. Miniature Environmental Air Sampler Using Aerogel for Biological Material Collection and Fluid Reduction

    SBC: Pacific-sierra Research Corp.            Topic: N/A

    Sensors exist to detect biological warfare agents and to provide an early warning so that precautionary and countermeasures can be implemented if necessary. Current assay technology is capable of detecting quantities of bacteria, viruses, and toxin molecules to levels as low as 10-12g. Introduction of the collected material into some assay devices requires sample reduction to liquid phase. An a ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  7. Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    The field training of Reserve Component units is difficult because of limited training time and facilities and the difficulty in assembling all necessary player personnel. Computer wargames which allow interactive play of player personnel are a relatively inexpensive alternative and supplement to field exercises. Unfortunately, most existing simulations are designed to exercise maneuver command an ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
  8. Missing Title

    SBC: Optical Polymer Research, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of DefenseDefense Advanced Research Projects Agency
  9. Hybrid Packaging and Integration Methods for Miniature Ultrasound Imaging Array

    SBC: TETRAD CORPORATION            Topic: N/A

    The feasibility of building small ultrasound imaging arrays with integrated electronics is explored. These arrays will ultimately be used to build laparoscopic, ultrasound imaging probes which can be used at forward military surgical locations or in emergency rooms and surgical suites. The methods for building miniature laparoscopic probes are described and arguments presented which indicated th ...

    SBIR Phase II 1997 Department of DefenseDefense Advanced Research Projects Agency
  10. TIDGET Emergency Location Sensor for Automobiles

    SBC: THE NAVSYS CORPORATION            Topic: N/A

    The DOT has identified the need for an emergency location service as part of the IVHS program. GPS has been proposed as a method of providing location in support of this "Mayday" service. However, the expense, slow time-to-first-fix, and inability to compute a navigation fix except when four satellites are visible make conventional GPS receivers inappropriate for emergency location. NAVSYS has dev ...

    SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government