You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  2. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  3. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40444 November 18, 1996 Southwest Sciences, Inc. Increasing energy consumption and environmental degradation may contribute to deleterious changes in the radiative balance and chemical composition of the atmosphere. The quantitative measurement of water vapor in the troposphere and lower stratosphere is crucial for the study of meteorological and climati ...

    SBIR Phase II 1997 Department of Energy
  4. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  5. A FEASIBILITY STUDY FOR A 5-MW, 300-GHZ QUASI-OPTICAL GYROTRON

    SBC: PHYRE TECHNOLOGIES, INC.            Topic: N/A

    HIGH POWER, CW (CONTINUOUS WAVE) SOURCES AT FREQUENCIES NEAR 300 GHZ ARE NEEDED FOR ELECTRON CYCLOTRON HEATING IN ADVANCED MAGNETIC FUSION DEVICES SUCH AS THE CIT (COMPACT IGNITION TOKAMAK). RECENT DEVELOPMENTS IN GYROTRONS HAVE PUSHED THE STATE OF THE ART TO 100 KW CW AT 140 GHZ. ONE MEGAWATT AT 140 GHZ APPEARS FEASIBLE, BUT NEARTO THE LIMIT OF THE CURRENT FORM OF THE GYROTRON. THE QUASI-OPTICAL ...

    SBIR Phase II 1988 Department of Energy
  6. A FIBER OPTIC PRESSURE SENSOR FOR USE IN WELLBORES

    SBC: Optech            Topic: N/A

    PRESSURE MEASUREMENTS DEEP IN GEOTHERMAL WELLBORES PROVIDE SOME OF THE MOST VALUABLE DATA FOR MEASURING THE PRODUCTIVITY OF GEOTHERMAL WELLS AND FOR ASSESSING RESERVOIRCHARACTERISTICS. WELLBORES HAVE VERY HIGH PRESSURE AND VERY LOW PH, BUT, MOST SIGNIFICANTLY, THEY HAVE VERY HIGH TEMPERATURES (UP TO 350 DEGREES CENTIGRADE) THAT PRECLUDE PRESENT PRESSURE MEASURING INSTRUMENTATION FROM OPERATING ADE ...

    SBIR Phase I 1988 Department of Energy
  7. A 34 GHz High-Power Micro-Pulse Klystron

    SBC: Fm Technologies Inc            Topic: N/A

    161 A 34 GHzHigh-Power Micro-Pulse Klystron--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82374 Amount: $75,000 High-current pulses of electrons are widely used in injector systems for electron accelerators, such as industrial linacs, as well ...

    SBIR Phase I 1997 Department of Energy
  8. A HEAVY ION RECIRCULATING LINAC FOR INERTIAL FUSION

    SBC: Fm Technologies Inc            Topic: N/A

    THIS STUDY INVOLVES DESIGN OF A HIGH CURRENT, HEAVY ION, RECIRCULATING, INDUCTION LINEAR ACCELERATOR FOR INERTIAL FUSION. DOE RESEARCH PROGRAMS IN INERTIAL FUSION HAVE SHOWNTHAT THE HEAVY ION DRIVER METHOD IS A PROMISING ONE IN TERMSOF ION DEPOSITION, PELLET PHYSICS, ION BEAM TRANSPORT, AND OTHER MAJOR CHARACTERISTICS. HOWEVER, TO DATE SYSTEM DESIGNS HAVE BEEN LIMITED TO LINEAR ACCELERATORS BASED ...

    SBIR Phase I 1989 Department of Energy
  9. A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators

    SBC: Fm Technologies Inc            Topic: N/A

    149 A High-Charge Electron Gun for Dielectric Type Wake-Field Accelerators--FM Technologies, Inc., 10529-B Braddock Road, Fairfax, VA 22032-2236; (703) 425-5111 Dr. Frederick M. Mako, Principal Investigator Dr. Frederick M. Mako, Business Official DOE Grant No. DE-FG02-97ER82375 Amount: $75,000 The development of high-current, short-duration pulses of electrons used in injectors of particle a ...

    SBIR Phase I 1997 Department of Energy
  10. A HIGH POWER MICROWAVE AMPLIFIER BASED ON TRANSVERSE MODULATION

    SBC: Fm Technologies Inc            Topic: N/A

    A MICROWAVE AMPLIFIER IS PLANNED THAT SHOULD BE CAPABLE OF PEAK POWER OF UP TO SEVERAL HUNDRED MEGAWATTS AT HIGH EFFICIENCY AS WELL AS CONTINUOUS POWER AT LOWER LEVELS. THECONCEPT IS BASED ON TRANSVERSE MICROWAVE MODULATION OF A HIGH VOLTAGE ELECTRON BEAM COMBINED WITH A BENDING MAGNET TO PRODUCE AXIAL BUNCHING IN AN OUTPUT CAVITY. THE MECHANISM AVOIDS THE DIFFICULTY OF LONGITUDINAL BUNCHING AT RE ...

    SBIR Phase II 1989 Department of Energy
US Flag An Official Website of the United States Government