You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES
SBC: MATERIALS MODIFICATIONS INC Topic: N/AIN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...
SBIR Phase I 1990 Department of DefenseArmy -
Acoustic Sensor Simulation and Environment Technology
SBC: TECHNICAL SOLUTIONS, INC. Topic: N/AA quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...
SBIR Phase I 1996 Department of DefenseArmy -
A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase II 1996 Nuclear Regulatory Commission -
Advanced Armor Vehicle Design
SBC: Physics Mathematics & Topic: N/AThis project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...
SBIR Phase I 1997 Department of DefenseArmy -
ADVANCED CONCEPT EVALUATION
SBC: Physics Mathematics & Topic: N/AN/A
SBIR Phase I 1990 Department of DefenseArmy -
ADVANCED INTEGRATED SERVICES DATA DISTRIBUTION FOR TACTICAL C3I
SBC: Lica Systems, Inc. Topic: N/ATHE ARMY'S CURRENT TACTICAL COMMUNICATIONS ARCHITECTURE CONSISTS OF THREE VERY CAPABLE BUT INDEPENDENT SYSTEMS: THE ARMY DIGITAL DATA SYSTEM (ADDS), THE MOBILE SUBSCRIBER EQUIPMENT (MSE), AND THE COMBAT NET RADIO FUNCTIONAL SYSTEM (CNR). FULLY AUTOMATED INTERFACES BETWEEN THESE SYSTEMS DO NOT EXIST. IN ADDITION, EACH SYSTEM HAS BEEN TAILORED FOR ONLY ONE TYPE OF COMMUNICATION SERVICE AND IN THE CA ...
SBIR Phase II 1990 Department of DefenseArmy -
Advanced Microwave Camera for 3-D Imaging of Water Channels in a Porous Medium
SBC: SATIMO, INC. Topic: N/AThis advanced development program is devoted to adapting SATIMO's proprietary Microwave Camera design and the associated proprietary microwave imaging codes based on Augumented Diffraction Tomography (ADT) and the Volumetric Electric Field Integral Equation (VEFIE) to provide efficient 3-D imaging of water movement along perferred flow channels during snowmelt. The customized Microwave Camera wil ...
SBIR Phase I 1996 Department of DefenseArmy -
Advanced Wireless Fuze Setter Technology for Medium and Large Caliber Rapid Fire Auto Loaders
SBC: SYNTRONICS Topic: A15069Syntronics, LLC proposes the development of a simple and secure non-contact fuze setter that uses bi-directional optical data transmission coupled with either Near Field Magnetic Inductance (NFMI) or optical transfer to provide external power to the fuze - both approaches will be investigated. Bi-directional transfer of data in RS-232 format without randomization or other special processing on eit ...
SBIR Phase I 2015 Department of DefenseArmy -
Affordable Sensor Technologies for Infrastructure Condition
SBC: Stratamagnetic Software, LLC Topic: N/AThe proposed Phase I project is the design and development of a wireless comprehensive sensor system for structural health assessment and monitoring. The final goal will be a system consisting of sensor modules or packages which can be permanently placed at the selected critical locations within a structure and which are powered and communicate wirelessly with a master station. The sensor module ...
SBIR Phase I 1997 Department of DefenseArmy -
A Mathematical Cyber Ontology
SBC: SILVER BULLET SOLUTIONS, INC. Topic: A15036The objective of this work is the development of a mathematical ontology for cyber events and entities. We use the qualifier mathematical to mean that in such an ontology, every type (or class) has a distinct mathematical interpretation to contrast it with many ontologies today that differ little from conventional data models or schemas. We will leverage such an ontology we developed for the DoD C ...
SBIR Phase I 2015 Department of DefenseArmy