You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACCELERATED CORROSION TESTING CHAMBER FOR WHEELED VEHICLES

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    IN THIS PHASE I EFFORT, THE GOAL IS TO DETERMINE THE FEASIBILITY OF CONDUCTING ACCELERATED CORROSION TESTING OF VEHICLES BY SIMULATING 5-10-15 YEARS OF FIELD LIFE IN A COMPUTER CONTROLLED ENVIRONMENT SIMULATION CHAMBER. THE DIFFERENT REQUIREMENTS OF THE CHAMBER, THE TYPES OF ENVIRONMENTS PRESENT IN THE DIFFERENT GEOGRAPHICAL REGIONS, THE CORRELATION BETWEEN ACCELERATED CHAMBER TESTS AND FIELD COND ...

    SBIR Phase I 1990 Department of DefenseArmy
  2. Acoustic Sensor Simulation and Environment Technology

    SBC: TECHNICAL SOLUTIONS, INC.            Topic: N/A

    A quality simulation which allows a user to simulate the acoustic emissions in a multi-source environment and then study the effects these conditions have on a set of acoustic sensors would be of great value. As acoustic sensors technology continues to advance with robust algorithms for detection, tracking and identification as well as high performance hardware providing real-time operation, thes ...

    SBIR Phase I 1996 Department of DefenseArmy
  3. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. Advanced Armor Vehicle Design

    SBC: Physics Mathematics &            Topic: N/A

    This project applies a combination of Artificial Neural Networks (ANN), Genetic Algorithms (GA), and CAD software to the problem of optimum armor design. Previous work for TACOM has established the efficacy of ANN/GA as applied to the problem of 1-D armor design. This new work will extend the concept to full 3-D vehicle geometries (CAD models). The CAD part of the code will handle the 3D data d ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. ADVANCED CONCEPT EVALUATION

    SBC: Physics Mathematics &            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
  6. ADVANCED INTEGRATED SERVICES DATA DISTRIBUTION FOR TACTICAL C3I

    SBC: Lica Systems, Inc.            Topic: N/A

    THE ARMY'S CURRENT TACTICAL COMMUNICATIONS ARCHITECTURE CONSISTS OF THREE VERY CAPABLE BUT INDEPENDENT SYSTEMS: THE ARMY DIGITAL DATA SYSTEM (ADDS), THE MOBILE SUBSCRIBER EQUIPMENT (MSE), AND THE COMBAT NET RADIO FUNCTIONAL SYSTEM (CNR). FULLY AUTOMATED INTERFACES BETWEEN THESE SYSTEMS DO NOT EXIST. IN ADDITION, EACH SYSTEM HAS BEEN TAILORED FOR ONLY ONE TYPE OF COMMUNICATION SERVICE AND IN THE CA ...

    SBIR Phase II 1990 Department of DefenseArmy
  7. Advanced Microwave Camera for 3-D Imaging of Water Channels in a Porous Medium

    SBC: SATIMO, INC.            Topic: N/A

    This advanced development program is devoted to adapting SATIMO's proprietary Microwave Camera design and the associated proprietary microwave imaging codes based on Augumented Diffraction Tomography (ADT) and the Volumetric Electric Field Integral Equation (VEFIE) to provide efficient 3-D imaging of water movement along perferred flow channels during snowmelt. The customized Microwave Camera wil ...

    SBIR Phase I 1996 Department of DefenseArmy
  8. Affordable Sensor Technologies for Infrastructure Condition

    SBC: Stratamagnetic Software, LLC            Topic: N/A

    The proposed Phase I project is the design and development of a wireless comprehensive sensor system for structural health assessment and monitoring. The final goal will be a system consisting of sensor modules or packages which can be permanently placed at the selected critical locations within a structure and which are powered and communicate wirelessly with a master station. The sensor module ...

    SBIR Phase I 1997 Department of DefenseArmy
  9. An Advanced Integrated Electric Wheel Motor and Hydraulic Suspension System for High-Mobility Scout Ground Vehicle

    SBC: NEW GENERATION MOTORS CORP.            Topic: N/A

    Military scout vehicles and commercial sports utility vehicles share the common need for advanced suspension/drive systems that offer robustness over widely varying terrain. The ultimate system for handling, ride isolation, and stability control would incorporate high efficiency electric motors independently driving the four wheels, with one on-board high-level computer for controlling the active ...

    SBIR Phase I 1997 Department of DefenseArmy
  10. ANALYSIS AND EVALUATION OF ADVANCED DIRECTION FINDING (DF) APPROACHES

    SBC: INFORMATION SYSTEMS LABORATORIES INC            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseArmy
US Flag An Official Website of the United States Government