You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. A FUEL/AIR DRIVE FLUX COMPRESSOR POWER UNIT FOR ELECTROTHERMAL GUNS

    SBC: KTECH CORP.            Topic: N/A

    The Ktech Team proposes a feasibility study of a fuel/air driven flux compression power unit (FCPU) for electric guns. Through variations of inductance gradients and through changes in scale, the proposed technology will be applicable to both electrothermal/chemical and electromagnetic guns. In the Phase 1 effort, we develop simulation models to predict the performance of the flux compression po ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  3. A Megapixel Gamma Camera for Arms Control Verification

    SBC: LEXITEK INC            Topic: N/A

    Lexitek proposes to develop an imaging gamma-ray detector with 1024 x 1024 pixels for arms control verification. The proposed detector significantly enhances the resolution of fissionable material distribution without compromising energy resolution. The detector consists of a scintillating crystal and associated sensors which determine the energy and position of the scintillation with high spat ...

    SBIR Phase I 1997 Department of DefenseDefense Threat Reduction Agency
  4. An Improved Plasma Opening Switch for DECADE

    SBC: NumerEx            Topic: N/A

    CURRENT ATTEMPTS TO USE THE PLASMA OPENING SWITCH (POS) FOR DECADE HAVE NOT YET BEEN ENTIRELY SUCCESSFUL DUE TO THE APPARENT INABILITY OF THE SWITCH TO OPEN EFFICIENTLY TO A HIGH-IMPEDENCE LOAD. RESEARCH DIRECTED TOWARD IMPROVING THE PERFORMANCE OF THE POS IN THE LONG-CONDUCTION TIME REGIME HAS BEEN FRUSTRATED BY THE INABILITY OF COMPUTATIONAL TOOLS TO OPERATE IN THE PARAMETER REGIMES OF INTEREST ...

    SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency
  5. A NOVEL FIELD PROGRAMMABLE GATE ARRAY FOR SPACE APPLICATIONS

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    Mission Research Corporation proposes the development of a unique FPGA (field programmable gate array) for applications in space and other military and civilian environments requiring the versatility of reconfigurability with retention of the configuration in an unpowered state. The FPGA will be capable of being configured once and retaining that configuration for a minimum of 10 years even with ...

    SBIR Phase II 1997 Department of DefenseDefense Threat Reduction Agency
  6. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. EMP AND HPM SUPPRESSION TECHNIQUES

    SBC: Integrated Sciences            Topic: N/A

    Survival of present day microelectronic circuits depends on their protection from self generated and external electromagnetic interference. This proposal is oriented toward the class of interference generally referred to as overvoltage transients. Means for mitigating these transients include gas discharge tubes, and various solid state devices. Each of these has their own advantages in particu ...

    SBIR Phase I 1996 Department of DefenseDefense Threat Reduction Agency
  9. FAST-RISE HIGH PRESSURE GAUGE FOR LONG-DURATION NUCLEAR AIRBLAST

    SBC: KTECH CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Threat Reduction Agency
  10. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government