You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  4. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1989 Nuclear Regulatory Commission
  5. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  6. High Accuracy Mortar Fire Control System

    SBC: PRECISION TARGETING, LLC            Topic: SOCOM172006

    The Precision Targeting High Accuracy Mortar Fire Control System (HAM-FCSt) is a sensor suite and ballistic solution providing equipment that is mounted to the mortar tube and provides the user with real-time critical system information on the fire solution. The intuitive user controls and display system allow the user to focus on the employment of the mortar system and less on the positioning and ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
  7. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. Investigation of Molded Photovoltaic Case

    SBC: ENERGY CONVERSION DEVICES, INC.            Topic: N/A

    Portable electronic equipment, whether military or civilian, now typically contain rechargeable batteries. Often it is inconvenient or impossible to connect this equipment to conventional battery charging sources. It would be highly desirable to incorporate a built-in battery recharging source with the equipment to overcome this shortcoming. Ideally this recharging source should not take up any ex ...

    SBIR Phase II 1996 Department of DefenseSpecial Operations Command
  9. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    THE RESEARCH PROGRAM WILL DEVELOP A MICROCOMPUTER BASED SYSTEM OF HARDWARE AND SOFTWARE WHICH WILL ALLOW THE USER TOEXECUTE MAINFRAME BASED CODES ON THE MICROCOMPUTER. IN ADDITION PARALLEL EXECUTION OF SEVERAL CODES AT ONCE IS POSSIBLEA SPECIAL INPUT AND OUTPUT PROCESSOR MODULES WILL ALSO BE DEVELOPED TO DEMONSTRATE THE USER FRIENDLY CAPABILITIES OF THE SYSTEM AND FACILITATE INPUT PREPARATION AND ...

    SBIR Phase II 1989 Nuclear Regulatory Commission
  10. Rapid Acquisition Demonstrator

    SBC: GBTI Solutions, Inc.            Topic: SOCOM181004

    By the conclusion of Phase 1, important discoveries were made concerning the technological, market, and business feasibility of the Rapid Acquisition Platform. We have concluded that the RAP is feasible and may proceed to product development. In Phase II, GBTI will develop an end-to-end RAP utilizing the scientific and technological discoveries made in Phase 1. Phase 2 will be implemented over the ...

    SBIR Phase II 2019 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government