You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SEISMIC PRA

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED FOR PROBABILISTIC ANALYSIS OF THE RISK FROM EARTHQUAKE-INITIATED ACCIDENTS AT NUCLEAR POWER REACTORS. THESE TECHNIQUES ARE NOW BEGINNING TO BE APPLIED AS PARTS OF LARGER PRA STUDIES. HOWEVER, THE RESULTS OF APPLYING THESE SEISMIC PRA TECHNIQUES ARE STILL HIGHLY UNCERTAIN, AND THE INSIGHTS GAINED SO FAR FOR SPECIFIC REACTORS ARE DIFFICULT TO GENERALIZE. THIS ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  2. Development of Self-Repairing Concrete Containers of Radioactive Waste Using Superelastic Reinforcement

    SBC: DPD, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  3. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL

    SBC: Levy S Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF A PRESSURIZED WATER REACTOR (PWR) TRANSIENT ANALYSIS MODEL FOR USE ON A MICROCOMPUTER. THE INTENDED APPLICATION OF THIS PWR MODEL IS FOR ANALYSIS OF PWR SYSTEM RESPONSE, INCLUDING FORCED AND NATURAL CIRCULATION OPERATION. THE PRIMARY USER OF SUCH A MODEL WOULD BE A UTILITY OR NUCLEAR REGULATORY COMMISSION (NRC) ENGINEER OR PLANT OPERATOR PER ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  5. STUDY ON AVAILABILITY AND COMPOSITION OF METAL BEARING WASTES

    SBC: N.h. Parker, P.e. And            Topic: N/A

    THE WASTE STREAMS PRODUCED IN MANY MINERAL PROCESSING PLANTS ARE OFTEN TREATED ON AN "AD HOC" BASIS, MEETING THE ESSENTIAL REQUIREMENTS AT A GIVEN TIME. THESE WASTES DO CONTAIN VALUABLE METALS, WHICH ARE NOT RECOVERED DUE TO LACK OF OVERALL PLANNING OR DUE TO NONOPTIMAL PROCESSING. OPTIMIZING EXISTING PROCESSES OR INNOVATIVE PROCESS DESIGN FOR TREATMENT OF THESE WASTES WOULD YIELD VALUES, CONSERVE ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  6. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  7. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  8. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  9. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  10. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government