You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. "EXTENDING A HCLPF-BASED SEISMIC MARGIN REVIEW TO ANALYZE PLANT DAMAGE STATES AND THE ROLE OF HUMAN FACTORS AND NON-SEISMIC FAILURES"

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED TO ANALYZE THE 'SEISMIC MARGIN' OF A NUCLEAR POWER PLANT USING THE HCLPF CONCEPT (HIGH CONFIDENCE OF A LOW PROBABILITY OF FAILURE). STARTING WITH AN EARTHQUAKE LEVEL SHOSEN FOR MARGIN REVIEW, THE TECHNIQUE DETERMINES WHETHER THE PLANT CAN OR CANNOT 'WITHSTAND THE REVIEW-EARTHQUAKE WITHOUT CORE DAMAGE. HERE 'WITHSTAND' MEANS 'WITHSTAND WITH A HIGH CONFIDENCE ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  3. A Detection System for Determining the Concentration, Size, and Depth of Buried Radioactive Material

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  4. DEVELOPMLENT OF A LAUNDRY MONITOR FOR DETECTION OF HOT PARTICLE CONTAMINATION

    SBC: Shonka Research Associates            Topic: N/A

    TWO APPROACHES WILL BE EXAMINED TO SIGNIFICANTLY IMPROVE THESENSITIVITY OF LAUNDRY MONITORS TO DETECT AND SPECIFY LOCATION OF HOT PARTICLES ON LAUNDERED GARMENTS. THESE PROPOSED TECNIQUES HAVE HIGH POTENTIAL FOR DETECTING BOTH LOW ENERGY BETA AND ALPHA PARTICLE RADIATION AS WELL AS IMPROVING SENSITIVITY BY REDUCING BACKGROUND COUNT RATE.

    SBIR Phase II 1990 Nuclear Regulatory Commission
  5. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. "SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"

    SBC: Fluid Physics Ind.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. A REMOTE LASER INSPECTION SYSTEM FOR NUCLEAR REACTOR COMPONENTS

    SBC: METROLASER, INCORPORATED            Topic: N/A

    THE DAMAGE FROM OPERATING STRESSES, AGING, AND ENVIRONMENT ACT TO MODIFY THE VIBRATIONAL MODAL PATTERNS OF NUCLEAR REACTOR COMPONENTS. WE PROPOSE TO EVALUATE THE FEASIBILITY OF APPLYING HOLOGRAPHIC TECHNIQUES FOR MONITORING AND QUANTIFYING THESE PATTERNS. THESE MEASUREMENTS COULD BE PERFORMED REMOTELY AND WITH MINIMUM DISRUPTION OF PLANT OPERATIONS. THE APPLICATION OF HOLOGRAPHY TO AUGMENT THE USE ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  9. ANALYSIS AND TRAINING OF AN ARTIFICIAL NEURAL NETWORK NETWORK NUCLEAR POWER PLANTACCIDENT DIAGNOSTIC ADVISOR

    SBC: Netrologic, Inc.            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO DEVELOP AN ARTIFICIAL-INTELLIGENCE FAULT-DIAGNOSTIC SYSTEM THAT WILL CLASSIFY, IN REAL-TIME, NUCLEAR POWER PLANT TRANSIENTS AND PROVIDE ERROR BOUNDS ON ITS DIAGNOSES. THE GOAL IS TO DEVELOP AN ARTIFICIAL NEURAL NETWORK (ANN) PARADIGM THAT IS CAPABLE OF NOT ONLY PROVIDING A PROPER CLASSIFICATION BUT ALSO GIVING A FIGURE OF MERIT FOR ITS ANSWER. THE PROPO ...

    SBIR Phase I 1991 Nuclear Regulatory Commission
  10. HIGH SENSITIVITY LANDFILL MONITOR

    SBC: Shonka Research Associates            Topic: N/A

    N/A

    SBIR Phase I 1991 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government