You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Wideband Fast Switched RF Synthesizer

    SBC: SenSyTech, Inc. Imaging Group            Topic: N/A

    The current market for fast switching frequency sythesizers is growing rapidly. Most synthesizers available today will not meet the stringent requirements for switching quickly, providing spectrally pure RF outputs and minimizing physical size and cost. As part of a current SBIR program, S.T. Research has developed a wideband, fast switching synthesizer, based on the use of broadband phase-locke ...

    SBIR Phase I 1997 Department of DefenseArmy
  2. Whole Body Kinesthetic Displays

    SBC: Cybernet Systems Corporation            Topic: N/A

    Virtual reality-based training systems are becoming a reality. Significant advances in photo-realistic image rendering has made reasonably priced high performance computer generated visuals commonplace. While development of the visual aspect of a virtual world is a significant artistic enterprise, it is no longer technically difficult. Similarly, computer capture and generation of digitized soun ...

    SBIR Phase II 1996 Department of DefenseArmy
  3. VISUAL TRANSITION ENHANCEMENT

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    SINCE THE ADVENT OF ARMORED VEHICLES, SEVERAL PROBLEMS HAVE PLAGUED THEIR DESIGN WHICH DIRECTLY AFFECT THE MANNER IN WHICH THE CREW VIEWS THE BATTLEFIELD AND HOW THEY CAN SUCCESSFULLY COMPLETE THEIR MISSION. OBVIOUSLY THE NEED TO PROTECT THE CREW/EQUIPMENT IS OF PARAMOUNT IMPORTANCE. FROM A DESIGN PERSPECTIVE, THE TRADEOFF HAS ALWAYS BEEN VISION AGAINST ARMOR. SEVERAL ANALYSES CONDUCTED BY CONTRAC ...

    SBIR Phase I 1990 Department of DefenseArmy
  4. Vehicle Lubrication Based On Viscoelastic Polymers

    SBC: THE TECHNOLOGY PARTNERSHIP            Topic: N/A

    Tactical wheeled vehicles represent a prominent portion of the Army's budget for both acquisition and operating costs. TACOM has identified suspension lubrication as a mission critical area for improvement. The goal is to lubricate a vehicle's suspension continuously for two years. This should create a cascade of cost effects in both maintainability and reliability. Single-point lubricators ba ...

    SBIR Phase I 1997 Department of DefenseArmy
  5. URBAN WARFARE DIGITAL DATABASE

    SBC: Mrj Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  6. UPSCALED SELF-PROPAGATING HIGH TEMPERATURE SYNTHESIS (SHS)/DYNAMIC COMPACTION PROCESSING

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  7. TUNABLE-WAVELENGTH COMPACT MILLIMETERWAVE RADAR FOR CLOUD MAPPING

    SBC: American Research Corporation of Virginia            Topic: N/A

    THERE IS A NEED OF A MM-WAVE RADAR TO RECORD THE INTERNAL STRUCTURE OF SMOKE OBSCURANT CLOUDS GENERATED DURING THE TESTS. MILLIMETER WAVE RADAR WITH 7.5M RANGE RESOLUTION AND 0.5 DEGREE ANGULAR RESOLUTION ARE REQUIRED. THE MILLIMETER WAVE RADAR TO BE DEVELOPED UNDER THIS PROPOSAL IS FREQUENCY TUNABLE IN A WIDE RANGE (10@0GHZ) AND THUS THE SPATIAL RESOLUTIONS CAN BE TUNED ALSO IN A WIDE RANGE. TYPI ...

    SBIR Phase II 1990 Department of DefenseArmy
  8. Topographic Technology Enhancement

    SBC: OPTIMETRICS, INC.            Topic: N/A

    DMA is now publishing its city graphi product at 1:25,000 scale in the Vector Product Format (VMap 3). The problem is that the level of detail in the product is insufficient when measured against the needs of the Special Operations Forces (SOF) and the Modeling and Simulation (M&S) communities. The SOF requires highly detailed information for planning and rehearsal, particularly for Operations O ...

    SBIR Phase I 1996 Department of DefenseArmy
  9. THIN FILM SENSORS TO EVALUATE CHEMICAL AND BIOLOGICAL THREATS TO ARMY STRUCTURES

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseArmy
  10. The G-BAT concept: In-soil Acoustic Integrated Detection and Location of Buried Metallic and Non-metallic Targets

    SBC: K2 TECHNOLOGIES, LLC            Topic: N/A

    This proposal develops an experimental prototype employing beam shaped acoustic pulse in soil for the integrated detection and location of buried metallic and non-metallic targets. Detection of buried mines exploiting the electromagnetic spectrum has had limited success because of the intrinsic trade-off in system (pixel) resolution, search rate, signal and image processing, as well as lack of ro ...

    SBIR Phase I 1997 Department of DefenseArmy
US Flag An Official Website of the United States Government