You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ZEOLITE OPTRODES

    SBC: TDA RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  2. Wind-Field and Wind-Shear Detection Using Random-Modulated, Continuous-Wave Lidar and Edge Techniques

    SBC: Ophir Corporation            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  3. Whole Arm and Hand-Finger Force Reflecting Masters

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  4. Whole Arm and Hand-Finger Force Reflecting Masters

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1994 National Aeronautics and Space Administration
  5. WAVELENGTH DIPLEXED, FIBER COUPLED, COHERENT LASER RADAR MEASUREMENT SYSTEM

    SBC: DIGITAL SIGNAL CORP.            Topic: N/A

    THERE IS A NEED FOR FIBER COUPLED PROXIMITY SENSORS WITH HIGH SPEED AND ACCURACY FOR APPLICATIONS TO ROBOTIC END EFFECTORS AND TO AUTOMATED INSPECTION AND QUALITY CONTROL. THE PROPOSED PHASE I EFFORT WILL DEMONSTRATE A NOVEL, ROBUST, INTEGRATED SENSOR CONCEPT WITH MULTIPLE SENSOR CAPABILITY. FIBER OPTIC SENSORS HAVE BEEN DEMONSTRATED TO HAVE GEOMETRIC FLEXIBILITY. IN THE CASE OF PHASE MODULATED IN ...

    SBIR Phase II 1991 National Aeronautics and Space Administration
  6. WAVELENGTH DIPLEXED, FIBER COUPLED, COHERENT LASER RADAR MEASUREMENT SYSTEM

    SBC: DIGITAL SIGNAL CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  7. Vortex Flap Improvements for Enhanced Low-Speed Aerodynamics of Supersonic-Cruise Aircraft

    SBC: VIGYAN INC            Topic: N/A

    Leading edge vortex flap modifications are proposed for improvedlow-speed lift and L/D characteristics of supersonic cruiseaircraft. The aim is to increase the vortex-lift potential inaddition to generating vortex thrust on highly-swept wingconfigura

    SBIR Phase I 1994 National Aeronautics and Space Administration
  8. VIRTUAL REALITY USER-INTERFACE FOR ACTUALIZING A ROBOT (VIRTUAL-ROBOT) SYSTEM

    SBC: Kms Fusion Inc            Topic: N/A

    TIME-DELAYS AND LIMITED SENSORY FEEDBACK OF REMOTE TELEROBOTIC SYSTEMS TEND TO DISORIENT TELEOPERATORS AND DRAMATICALLY DECREASE THE OPERATOR'S PERFORMANCE. TO ELIMINATE THESE EFFECTS, A VIRTUAL REALITY USER-INTERFACE FOR ACTUALIZING A ROBOT (VIRTUAL-ROBOT) SYSTEM WILL BE DESIGNED. THE VIRTUAL-ROBOT SYSTEM WILL TOTALLY IMMERSE THE OPERATOR IN A SIMULATION OF THE REMOTE TELEROBOTIC ENVIRONMENT AND ...

    SBIR Phase I 1991 National Aeronautics and Space Administration
  9. Very-Long-Baseline-Array Recorder Applied to High-Resolution Nicrowave Survey Data

    SBC: Interferometrics, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  10. Versatile Space Welding System

    SBC: Electric Propulsion Laboratory, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government