You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Aim Telemetry Expert Analyst & Monitor

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  2. INCIPIENT COMBUSTION MONITOR FOR ZERO GRAVITY ENVIRONMENTS

    SBC: ADA Technologies, Inc.            Topic: N/A

    THE PROPOSED RESEARCH WILL INVESTIGATE THE FEASIBILITY OF USING A DYNAMIC EXPANSION CONDENSATION NUCLEI CHAMBER FOR THE DETECTION OF SUBMICROMETER PARTICLES EMITTED WHEN COMBUSTIBLE MATERIALS ARE HEATED. SUCH A DEVICE WOULD BE EMPLOYED AS THE SENSOR OF AN INCIPIENT COMBUSTION MONITOR FOR USE ON THE PROPOSED NASA SPACE STATION. COMBUSTIBLE MATERIALS EXPECTED TO BE USED IN THE CONSTRUCTION OF THE SP ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
  3. HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  4. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  5. A Novel Hydrogen-Fueled Propulsion System

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  6. AMTEC CONDENSER DESIGN FOR ZERO-G OPERATION

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  7. Automated Wafer Cartridge System

    SBC: ADVANCED MODULAR POWER SYSTEMS            Topic: N/A

    N/A

    SBIR Phase I 1993 National Aeronautics and Space Administration
  8. EXPERT ASSISTANT FOR INTEGRATED TIMING AND RELIABILITY DESIGN ANALYSIS

    SBC: Advanced Systems & Technologies Inc            Topic: N/A

    TIMING AND RELIABILITY PERFORMANCE ARE BECOMING INCREASINGLYCRITICAL CHARACTERISTICS OF EMBEDDED COMPUTER SYSTEM SOFTWARE. COMPLEX TRADEOFFS INVOLVING INTERACTIONS BETWEEN TIMING AND RELIABILITY PROPERTIES NEED TO BE MADE DURING DESIGN TO ENSURE THAT SYSTEMS WILL SATISFY STRINGENT PERFORMANCE REQUIREMENTS. THIS SBIR PROJECT WILL INVESTIGATE AN EXPERT SYSTEM BASED AUTOMATED TOOL TO ANALYZECOMPLEX S ...

    SBIR Phase II 1990 National Aeronautics and Space Administration
  9. CASE-BASED TIMING ASSESSMENT TOOL

    SBC: Advanced Systems & Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1991 National Aeronautics and Space Administration
  10. SOFT HUB FOR BEARINGLESS ROTORS

    SBC: Advanced Technologies, Inc            Topic: N/A

    THE ROTARY WING INDUSTRY HAS STRIVED TO DEVELOP A BEARINGLESS MAIN ROTOR (BMR), HAVING NO MECHANICAL BEARINGS. ALL TRUE BMR SYSTEMS ARE LIMITED BY THE STRENGTH IN STATIC-FATIGUE LOADS VERSUS FLAPWISE FLEXIBILITY, RESULTING IN LIMITED "G" MANEUVERS FROM A HIGHLY RESPONSIVE ROTOR SYSTEM. ATI'S SOFT HUB ROTOR CONCEPT ALLOWS TILTING OF THE ROTOR DISC MOVING THE VIRTUAL HINGE INBOARD ELIMINATING THIS U ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government